Laserfiche WebLink
Bonestrooy Rosene, Anderlik & Associates, Inc. <br />2335 W, Trunk Highway 36 <br />St. Paul, MN 55113 <br />612636-4600 <br />Engineers & Architects <br />OiM C, E. <br />W, Htaatne. f t. <br />Juirpt C, Amtffiik, ft, <br />BfttfyH A. UmOetf, f.£, <br />Michotd f. Tttfner, ft, <br />Jumrt C CMum, ft <br />CUnm B. Cook, f £*. <br />Kruk A. CtttUitm. ft. <br />Tho^% t .Vv/n. ft. <br />Hn HmrB W. fourt, f t. <br />Mooert C. ScMumh Hi, P.t <br />Msriftm L, P,t. <br />DomeiB C. Sufft4i, P. t <br />Jtffj A. BoufOtut, ft <br />Murk A. Hofwtm. p,t <br />TrB t, r»HB, P.t <br />Mt€kti T, Bawmmmm, ft. <br />Huturt M. fJtUtfru, ft <br />D u 9*B O. Ltaioiu, P.t <br />rtomeM If. PrterM, ft <br />C Lfttk, ft <br />KoffH L, wm, p.t <br />Umn M. MeluM, P.t <br />ttrutftM P. AmUnrtm. P t <br />A'tfvfA A, Bmtmmmm, P.t <br />MrfM M. Bo(/s, ft <br />Pobfft C Kuauk, A.tJk, <br />Thumm E, Ampit, ft <br />Snit tm Youmf, ft <br />CBefka A, EtrKkyom <br />Leo M, PewHUf <br />Hmrtom M, OI moo <br />SoaomM, Eberiio <br />November 3, 1986 <br />City or Orono <br />Bo.c 66 <br />Crystal Bay, MN 55323 <br />Atta: Mr. John Gerhardsoa <br />Re: File No. 139 <br />Orono Lane <br />Dear John, <br />We have reviewed relocating the intersection of Orono Lane and County Road 15 <br />as requested by the property owners. The intersection should be moved approx** <br />imately 325 feet east of the existing intersection. <br />We would recommend that the intersection be moved far enough to provide a 350 <br />foot sight distance for traffic coming from the west. This would be the mini­ <br />mum sight distance for a 50 MPU design speed. <br />Xne estimated cost to reconstruct the roadway would be $35,000. This is based <br />on a 24 foot wide street ui*rh a bituminous berm curb. The section would con­ <br />sist of stabilization fabric^ 2 feet of granular borrow, 8 inches of C^lass 5 <br />and 3 inches of bituminous surfacing. Soil borings taken previously as a part <br />of the sanitary sewer project in the area indicates organic material to 10 <br />feet deep. The preliminary estimate is based on the underlying material being <br />stable enough to support the proposed section. Soil borings will be necessary <br />if the project is to proceed. <br />The project cost would be shared by eight property owners which would result <br />in an assessment of $4,375.00. This preliminary estimate does not anticipate <br />any land costs for the project. <br />I <br />We would be pleased to meet with you and the property owners to review the new <br />access location. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />/ <br />Glenn R. Cook <br />GRC:li <br />End. <br />0345e 30 Year <br />Anniversary