Bonestrooy Rosene, Anderlik & Associates, Inc.
<br />2335 W, Trunk Highway 36
<br />St. Paul, MN 55113
<br />612636-4600
<br />Engineers & Architects
<br />OiM C, E.
<br />W, Htaatne. f t.
<br />Juirpt C, Amtffiik, ft,
<br />BfttfyH A. UmOetf, f.£,
<br />Michotd f. Tttfner, ft,
<br />Jumrt C CMum, ft
<br />CUnm B. Cook, f £*.
<br />Kruk A. CtttUitm. ft.
<br />Tho^% t .Vv/n. ft.
<br />Hn HmrB W. fourt, f t.
<br />Mooert C. ScMumh Hi, P.t
<br />Msriftm L, P,t.
<br />DomeiB C. Sufft4i, P. t
<br />Jtffj A. BoufOtut, ft
<br />Murk A. Hofwtm. p,t
<br />TrB t, r»HB, P.t
<br />Mt€kti T, Bawmmmm, ft.
<br />Huturt M. fJtUtfru, ft
<br />D u 9*B O. Ltaioiu, P.t
<br />rtomeM If. PrterM, ft
<br />C Lfttk, ft
<br />KoffH L, wm, p.t
<br />Umn M. MeluM, P.t
<br />ttrutftM P. AmUnrtm. P t
<br />A'tfvfA A, Bmtmmmm, P.t
<br />MrfM M. Bo(/s, ft
<br />Pobfft C Kuauk, A.tJk,
<br />Thumm E, Ampit, ft
<br />Snit tm Youmf, ft
<br />CBefka A, EtrKkyom
<br />Leo M, PewHUf
<br />Hmrtom M, OI moo
<br />SoaomM, Eberiio
<br />November 3, 1986
<br />City or Orono
<br />Bo.c 66
<br />Crystal Bay, MN 55323
<br />Atta: Mr. John Gerhardsoa
<br />Re: File No. 139
<br />Orono Lane
<br />Dear John,
<br />We have reviewed relocating the intersection of Orono Lane and County Road 15
<br />as requested by the property owners. The intersection should be moved approx**
<br />imately 325 feet east of the existing intersection.
<br />We would recommend that the intersection be moved far enough to provide a 350
<br />foot sight distance for traffic coming from the west. This would be the mini
<br />mum sight distance for a 50 MPU design speed.
<br />Xne estimated cost to reconstruct the roadway would be $35,000. This is based
<br />on a 24 foot wide street ui*rh a bituminous berm curb. The section would con
<br />sist of stabilization fabric^ 2 feet of granular borrow, 8 inches of C^lass 5
<br />and 3 inches of bituminous surfacing. Soil borings taken previously as a part
<br />of the sanitary sewer project in the area indicates organic material to 10
<br />feet deep. The preliminary estimate is based on the underlying material being
<br />stable enough to support the proposed section. Soil borings will be necessary
<br />if the project is to proceed.
<br />The project cost would be shared by eight property owners which would result
<br />in an assessment of $4,375.00. This preliminary estimate does not anticipate
<br />any land costs for the project.
<br />I
<br />We would be pleased to meet with you and the property owners to review the new
<br />access location.
<br />Yours very truly,
<br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
<br />/
<br />Glenn R. Cook
<br />GRC:li
<br />End.
<br />0345e 30 Year
<br />Anniversary
|