My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-1997 Council Packet
Orono
>
City Council
>
1997
>
01-13-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:16:51 PM
Creation date
7/31/2023 2:15:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. A “ ^ <br />CITY of CHtONO <br />Municipal Ofllces <br />Street Address: <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />Mailing Address: <br />P.O. Box 66 <br />Crystal Bay, MN 55323 0066 <br />Dear Residents of the North Long Lake and Long Lake Country Club Neighborhoods: <br />The City Engineer has completed a Feasibility Report concluding that construction of sanitary sewer <br />and force main to serve your two neighborhoods is feasible from an engineering standpoint, and <br />necessary because of the potential pollution problems to Long Lake and the surrounding watershed. <br />The capital cost as well as operation and maintenance costs have been considered in determining that <br />the project is cost effective. It is the Engineer's recommendation that the costs of serving these two <br />are?s «re interrelated and should be assigned equitably between all benefitted properties. <br />Costs of the project are summarized in the table below. There are 52 units proposed to be assessed <br />for the trunk and lateral improvements, with an additional 3 units to be assessed for trunk charges. <br />The City Council has not yet determined what percentage of the cost will be assessed to property <br />owners. The anticipated project schedule is as follows: <br />January, 1997 <br />January’, 1997 <br />March, 1997 <br />March, 1997 <br />April, 1997 <br />April, 1997 <br />May, 1997 <br />June, 1997 <br />October, 1997 <br />Public hearing <br />Order preparation of plans and specifications <br />Plans and specifications complete <br />Advertise for bids <br />Open bids <br />Assessment hearing <br />Award construction contract <br />Begin construction <br />Complete construction <br />If you have questions regarding this project, please contact City staff at 473-7357. <br />Tabic 1. Cost Summary <br />Item Estimated Cost <br />Trunk Facilities $414,157 <br />Lateral Facilities $616,114 <br />Dakota Avenue surfacing $19,284 <br />Total $1,049,555
The URL can be used to link to this page
Your browser does not support the video tag.