Laserfiche WebLink
DEC-19-199S 12:07 CITY OF LOfJG lake 612 476 9622 P.03 <br />NOW, THEREFORE, the parties hereto state as follows: <br />1 . Sanitary sewer line in current railroad rieht-of-way it is understood that <br />the City is requesting the State to replace any sanitary sewer lines curiently located <br />in the Burlington Northern railroad right-of-way as a part of the proposed project. It <br />is further understood that the City is requesting the State to upgrade said sewer lines <br />to meet the needs of the cities of Long Lake and Orono. The State will replace any <br />existing sanitary sewer lines currently located in Burlington Northern/ Sante Fe <br />railroad right-of-way, if said sewer line(s) is(are) disturbed as a part of the proposed <br />Trunk Highway 12 construction. The State is willing to upgrade new sanitary <br />sewer to meet the needs of the cities of Long Lake and Orono. There may be City <br />participation in the costs of any upgrade. The City will have the right to review and <br />approve any saritary sewer line plans prior to construction. <br />2. Surface Drainage It is understood that the City requests the State acquire <br />the Fleming Addition to provide a new storm water ponding facility, and to allow for <br />surface drainage to be rerouted from Long Lake into Long Lake Creek which flows <br />to Lake Minnetonka. It is understood that the design process has not progressed <br />sufficiently to determine the impacts or the best course of action regarding surface <br />drainage associated with the proposed construction. The State recommends the <br />appointment of a Technical Panel with the purpose of amending the cities storm