My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-1997 Council Packet
Orono
>
City Council
>
1997
>
01-13-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:16:51 PM
Creation date
7/31/2023 2:15:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO PARK COMMISSION <br />MEETING HELD ON NOVEMBER 4, 1996 <br />It was suggested that the concrete under the structure might be incorporated into the base <br />for the basketball court. The condition and location were discussed. There could be a <br />noise issue if located too near homes. Flint suggested that the cost for the base is not as <br />critical as using the optimal location for the court. Gerhardson suggested the costs be <br />known for the renovation before any further planning is done as well as obtaining a list of <br />possible uses for the shelter. The Commissioners felt that the budding could be used as a <br />picnic area, warming house, and rain shelter. Neighborhood picnics are conducted in the <br />park grounds. <br />The possibility of maintaining an ice rink for the 1996-97 season was discussed. Beal said <br />it was his understanding that an ice rink was not desired by the neighborhood. <br />McDermott and Use felt if the rink was better maintained, the neighbors would use a rink. <br />Ilse also suggested the rink be lit if reestablished. Beal noted there were two flood lights <br />in the vicinity. Gerhardson said lighting has been provided up to 10;00 p.m. in the past. <br />Concern was noted for correct directional lighting as to not disturb the neighbors. <br />McDermott asked that the area where the rink was located be preserved for such a <br />possible use in the future. <br />In discussing the location of the play equipment and basketball court, Flint suggested that <br />the two areas be separated as different age groups use each area. <br />The funding of the park rehabilitation was discussed. An estimated amount of $25,000 <br />had previously been discussed as a possible allocation for the play ground equipment. <br />McDermott was concerned that the amount was minimal in respect to the actual cost of <br />equipment today. He said that he would like to see more money set aside. Flint suggested <br />neighborhood assistance might be obtained in raising funds. The Park Dedication Fund is <br />estimated to have $150,000 in December of 1997 after the 1997 bike trail construction <br />costs have been paid, net of reimbursement by the DNR. It was questioned whether the <br />phase two plan for the O'Sullivan project in Navarre would result in a contribution to the <br />fund. Goetten informed the Commission that no requests have yet been made with respect <br />to Park Dedication Fees on this project. With the intense use of the property, it was <br />suggested that a Park Dedication contribution be sought. Goetten said she did not <br />disagree with that conclusion. Ilse said the contribution should be in addition to the <br />vacation of Navarre Lane (see agenda item #9 for discussion of the O'Sullivan project).
The URL can be used to link to this page
Your browser does not support the video tag.