Laserfiche WebLink
CHrmn M. Otut, P.C- KtM A. Co/Am, P.e. nomm £. fhftt, P.C.AktmA W, fttttr, P.E. <br />Aobtrt C. Stkmkhl. P.C. <br />UmrriK L. SomA i. f.£. <br />DohM C. tmttrAl, P.B. <br />Jtrry A. Btr uAt*. P-B. <br />Mart A. Hmum, P.B. <br />niK. FIM. P.B. <br />MkkaA T. Pmamam, P.B. <br />Pobtrt K. PftO*^‘ B.B. <br />DavU iMtata. P.B. <br />OmHuA. BrtHaaa <br />Uo M. Pawibky <br />HartmM. Oton <br />I Addi- <br />275 feet. <br />:hree <br />2* below <br />Lth culvert <br />MINNEHAHA CREEK <br />WATERSHED DISTRICT <br />P.O. Box 387, Wayzata, Minnesota 55391 <br />■OMO or MMMKRS: <br />H. Cochnn, Prtt. • Albtyt L Ithmin • John E. Ttiofint • Micliifl R. CarroU • CamiMt D. Awdrt <br />UKI MimiCfOIIM <br />March 5, 1984 <br />/ ! <br />Ms. Jeanne A. Mabusth, Zoning Administrator <br />City of Orono <br />PO Box 66 <br />Crystal Bay, Minnesota 55323 <br />I: j : n: n^TTf^ <br />, r . . ■ I I r <br />. » ! I <br />i /f I <br />Re: Preliminary Plat of Plentywood Farm - #818 <br />Preliminary Plat of Painters Creek - #804 <br />iij^ ^-6/994 <br />Dear Ms. Mabusth: <br />As requested In your letter dated February 27, 1984, we have reviewed the <br />above preliminary plats and have concluded that the projects will require <br />permit approval from the District. The owners should file for permit when <br />final grading and drainage plans are available. These plans should also <br />Include erosion control measures which will prevent sediment transport Into <br />adjacent wetlands and waterways during the grading and restoration period. <br />In addition. District staff offers the following comments: <br />Plentywood Farm - #818 <br />1.Outlots A, B, D and E <br />Lots 2 and 3, Block 1 <br />Lot 1, Block 2 <br />The final plat should show drainage easements for low areas on these <br />parcels below elevation 960. <br />2.Outlot F <br />Lot 2, Block 2 <br />Lots 1 and 2, Block 3 <br />The owner should determine the high water level for these parcels in view <br />of the proposed 24“ CMP and show drainage easements In the final plat. <br />3.The final grading and drainage plan should show a bench mark reference <br />for elevation. <br />Ms.' Jeanne Page Two March 5, li <br />Painters Ci <br />1. Outlo <br />The O' <br />B be I <br />final <br />The p <br />for ^ <br />The f <br />for € <br />Both of tlr <br />Since Impi <br />watershed <br />concerned <br />are review <br />Thank you <br />planning. <br />473-4224. <br />Very trul <br />EUGENE A. <br />Engineers <br />Michael / <br />cc: Boai <br />G« I