Laserfiche WebLink
^ I Bonestroo <br />Rosene <br />Anderlik & <br />\\\\ Associates <br />Engineers & Architects <br />October M, 1998 <br />Elizabeth VanZomeren <br />City Planner/Zoning Administrator <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, MN 55323 <br />Re: Stickncy Subdivision <br />File No. 139-2426 <br />Dear Liz: <br />Bonestroo. ffcsene. Anaeriik t*nd Assoc>^tes inc ts tvi Affirmative Action Equal Opportunity Employer <br />Principals Otto G Bonestroo. PE • Joseph C Anderlik PE • Marvin L Sofvala PE • <br />Ptchard E Tu■rre^ PE • G'enn ff Cook. PE • PoPert G Schunichi PE • Jerry A Bourdon. P£ • <br />Rooert W Rotene. PE and Susan M EPerlm C PA Senior Consu't.snts <br />Associate Pr.f^cipals Howsarj A Sanford PE • keitn A Gordon. PE • RoLert R P/efferle. PE • <br />Picna^d W Foster. PE • Oavid O Loskota ^E • Robert C Russek. Al A • Mark A Hanson. PE • <br />Michael T Rautmann PE • Ted K F?eid. PE • Kenneth P Anderson PE • Mark R Rolfs PE • <br />Sidney P VliJIiamson. PE. L S • Robert F Kotsmith • Agnes M Ring • Muharl P Rau PE • <br />Al.'an Rick Schmtdr. PE <br />Offices St Paul. Rochester. Wnimar and St Cloud MN • Milwaukee. W'l <br />Uebsrfe WWW bonestroo com <br />c <br />We have reviewed the preliminary plat for the proposed two-lot subdivision for George Stickney. <br />The site is located on Willow Drive South just south of 450 Willow Drive in the south half of <br />Section 3. We have the following comments in regards to engineering matters. <br />1. Access' There currently is no well defined access to the site. Proposed access locations should <br />provide adequate sight distance from the high point on Willow Drive located approximately 180- <br />feet south of the site. It may be appropriate from a safety perspective to combine two driveways <br />and have a shared access onto Lots i and 2. Maximum driveway grades should not exceed 10 <br />percent. <br />2. Utilities: The existing grades may make it difficult to locate primary and alternate septic sites. <br />City staff should review the proposed septic locations. <br />3. Grading: A grading and erosion control plan for the entire site should be submitted for review. <br />Erosion control measures should be in place prior to any grading. <br />4. Drainage: The draft version of the City ’s Comprehensive Storm Water Management Plan <br />(SWMP) shows that the site drains both east and west. The westerly portion of the site drains <br />westerly to an existing wetland identified a*' FR-P19. The remainder of the site drains easterly <br />to an existing wetland identified as TL-Pl 1. According to current Minnehaha Creek Watershed <br />District (MCWD) rules, subdivisions larger than 2 acres require the construction of a NURP <br />pond to treat stormwater from the site, i'his subdivision is larger than 2 acres and the MCWD <br />should review the plans. Depending on MCWD comments, ponding alternatives such as buffer <br />strips may be appropriate for this site. Phosphorous loadings leaving the site should be limited <br />to a maximum of 0.28 pounds/acre/year. A drainage area map with pre and post development <br />calculations should be submitted for review. <br />5. Easements: Utility easements should be shown 5-feet wide along the interior lot line. Drainage <br />easements should be provided across all wetlands, ponds and drainage ways. <br />2335 West Highway 36 • St. Paul, MN 55113 ■ 612-636*4600 • Fax: 612-636-1311