Laserfiche WebLink
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR JUNE 15, 1998 <br />(tfS - #2361 William and LaWayne Yaeger - Continued) <br />The Yaegers arc attempting to purchase Lot 65, and if successful, wisli to combine the two lots <br />into Record Lot 15A. <br />Gaffron stated a cabin was constructed on Lot 64, with the City issuing a stop work order for work <br />occuring without a building permit in July, 1997. The new cabin replaces a pre-existing cabin but <br />is in violation of lakcshore setback and hardcover regulations. Tlie new cabin as constructed requires <br />variances for lakeshore setback, side setback, 0-75 ’ hardcover, and a full perimeter foundation. A <br />gazebo located on the property was also built without a bulding permit and is in \ iolation of the side <br />lot setback. Staff noted that the complete replacement of the pre-existing cabin eliminates any <br />grandfathered status that the old cabin may have cnjo\ed. <br />The Planning Commission was requested K consider whether Lot 64 should be designated as an <br />individual Record Lot separate from Lots 65-8-9-10-11, and if so. what variances should be granted to <br />allow the new cabin and gazebo to remain in their non-conforming locations <br />City Staff is recommending that the Applicant acquire all six lots, and if not possible, to at least <br />acquire Lot 65 and combine it with Lot 64, then mo\e the cabin and gazebo to confomiing locations <br />75' from the lake. <br />Win Curtis, Attomey-at-Law, stated he had been asked to speak on behalf of the Yaegers in this <br />matter. The Yaegers have attempted to purchase all six lots to no a\ ail. and would now like to <br />pursue Option f=2, the purchase of Lot 65. combining it with Lot 64. and then mov e the eabin and <br />gazebo to conforming locations 75' from the lake. <br />Curtis reported the septic system has not been installed due to the stop work order which was issued, <br />and the Yaegers arc currently looking at three different options; hav ing a shared system on the property <br />to the south, install a septic system on Lot 65. or acquire an easement from the owner of <br />Lots 8-9-10-11 for purposes of a septic svstem. Curtis noted the septic issue could be dealt with at <br />a later time. <br />Gaffron stated the acquisition of Lot 65. combining it w ith Lot 64. and then moving the cabin and <br />gazebo to conforming locations 75' from the lake was a good solution to the problem, and would <br />recommend the Planning Commission approve the application. <br />Curtis remarked the gazebo would not need to be relocated if Lot 65 was acquircil. Curtis noted <br />the property owner for Lot 65 is aware of tonight's meeting but is not in attendance. If the additional <br />lot is purchased, the Yaegers arc asking for a 90 dav' time period in which to move the cabin. No <br />plumbing would be installed until the septic sv stem was installed. <br />Lindquist moved, McMillan seconded, to approve Application #2361, contingent upon <br />purchase of Lot 65, legal combination with Lot 64, with such combination to henceforth <br />be designated as Record Lot #15. The Yaegers are required to move the cabin within <br />six months from the date of acquisition of Lot 65 to a position that meets the lake and side <br />setbacks, and to comply with all regulations regarding installation of a septic system. The <br />lot area variance is also recommended for approval. VOTE: Ayes 7, Nays 0. <br />(#6) 2376 RICHARD AND MARION BROWN, 2685 SHADYWOOD ROAD - <br />CONDITIONAL USE PERMIT, 9:28 p.m. - 9:34 p.m. <br />Lr*...