Laserfiche WebLink
-5 <br />TO:Chair Smith and Orono Planning Commission Members <br />Ron Moorse, City Administrator <br />FROM; <br />DATE: <br />Liz Van Zomeren, City Planner/Zoning Administrator <br />July 16,1998 <br />SUBJECT:#2382 Busse Construction, on behalf of <br />Tim Otten, 425 Tumham Road <br />Conditional Use-Public Hearing <br />Zoning District: RR-1A One Family Rural Residential (5 acres) <br />Application:Busse Construction is working on the County Road 6 project for Hennepin <br />County. Due to the cut and fill process for the road work, Busse <br />Construction needs to find locations near the project to haul excess dirt. <br />Property owners in the area have requested fill. Land alteration of this <br />magnitude requires a conditional use permit. <br />The proposed land alteration will be located in the rear yard behind the <br />existing house and will be 220' x 180' in size and 3 ft. deep requiring 3,925 <br />cubic yards of fill. <br />Pertinent Ordinances: <br />Section 10.03, Subd. 19 and 20 <br />Findings: <br />1.That the proposed location of the conditional use is in accord with the objectives of the <br />Zoning Chapter and the purposes of the disitrict in which the site is located and <br />Comprehensive Municipal Plan; <br />The proposed location in the rear yard mil level an existing *bo\vV in the property owner’s <br />yard that he wants to use as yard. Several small trees and brush in the center of the fill area <br />would be removed. <br />U2382 <br />Otten <br />July 20. 1998 <br />page~l <br />J <br />i <br />i