Laserfiche WebLink
EXHIBIT E <br />page 3 of 3 <br />1) Raise back end of boat house to the level of post nu. 9 <br />add concfP‘e pads under beam. <br />2) Place 4 er i6' x 30' post to solid bottom using barge. <br />3) Move cross beam forward under the back frame <br />place on top of new post <br />4) Place barge in boat house and raise under roof beams <br />to allov/ nev/ 8x5 beams under front of boat house <br />End of boat house rased up