My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-18-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
05-18-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:22:48 PM
Creation date
7/27/2023 1:12:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#2370 - O’Keefe <br />May 14, 1998 <br />Page 2 <br />Hardcover: <br />0-75 ’ N. <br />75-250’ <br />0-75 ’ S. <br />Existing <br />496 sf (6.3%) <br />3985 sf (26.2%) <br />2284 sf(29.6%'> <br />6765 sf <br />Proposed Allowed <br />0 sf (0%) 0 sf (0%) <br />6288 sf (41.4%) 3800 sf (25%) <br />605 sf r7.8%^ _0sf(0%) <br />6893 sf 3800 sf <br />Variance <br />2488 sf (16.4%) <br />605 sf (7.8%'> <br />3093 sf <br />Proposed Lot Coverage by Structures = 3664 / 30,800 =11.9% (Meets 15% limit) <br />Proposed grading: 1. <br />2. <br />3. <br />Intent is to lower crown of hill by 2-3', including grading within 5’ of <br />side lot lines and within 0-75' zone, requiring a variance and CUP. <br />Intent is to excavate witliin the 0-75 ’ lakeshore protected zone to create <br />a walkout situation, requiring a variance and CUP. <br />Fill ranging from 1’ to 5’ will occur in the 75-250' and southerly 0-75' <br />zones to create a larger flat area for house and driveway. <br />Background <br />The existing house was built in 1910 according to tax records. The detached garage was built in <br />1973. A variance was granted in 1975 for an addition to the house and basement replacement. In <br />1989 a variance w-as granted for 4,940 sf hardcover in the 75-250' zone and 1,893 sf in the south 0- <br />75' zone (totalling 6833 sQ for replacement with a new residence. A CUP for grading in the 0-75 ’ <br />zones was also granted to allow for filling in the old house excavation and reworking the driveway. <br />That application included a request to excavate for a walkout, which was denied. The variance <br />approval was renewed in 1990 but was never used, so the current status of the site is as it was prior <br />to the 1989 review. <br />The applicant has provided a site plan showing removal of the existing detached garage near the <br />road, reconstruction/relocation of the driveway, and replacement of the existing 1100 sf footprint <br />house and 584 sf garage with a new residence and attached garage with a footprint totaling 3664 sf. <br />The lot coverage by structures will still be conforming at just under 12%. <br />Hardcover on the site is reduced in the 0-75 ’ zones and increased in the 75-250’ zone. There is a net <br />increase of about 128 sf over the entire lot by staffs calculation (414 sf per applicants calculation). <br />The proposed hardcover over the entire lot is essentially the same level as was approved in 1989-90. <br />The net effect is to shift a greater portion of the hardcover to locations further from the lake. <br />The house site is atop a hill on the otherwise very low and flat Baldur Park peninsula. Applicant <br />notes that lowering the hill slightly will result in the new residence being somewhat less imposing <br />in its surroundings. Both adjacent homes are lower in-the topography than applicants site. Note that
The URL can be used to link to this page
Your browser does not support the video tag.