My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-20-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
04-20-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:14:18 PM
Creation date
7/27/2023 1:06:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />SEPTIC SYSTEM APPROVAL <br />CITY of ORONO <br />Municipal Ofikes <br />PostOfnct6ox66 <br />Co stal Bay, Minnesota 55323-0066 <br />LOCATION: 3067 Farview Ln. <br />OWNER: Jon Rappaport <br />GENERAL CONTRACTOR:SEPTIC CONTRACTOR: <br />SITE EVALUATOR: S~P Testing <br />The City of Orono has Approved <br />REPORT DATE; February 21, 1998 <br />your on-site system design as of March 24, 1998 <br />(date)(approved-disapproved) <br />with the following comments: The design Is conditionally approved If the drainage is <br />linage ie diverted around the drainfield site and the drainage easement is revised <br />to reflect the new drainageway. Also, a staff variance is granted for the location <br />of the drainfield site on slopes greater than 6% due site limitations (site on 8%). <br />THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br />be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br />enclosed. <br />NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br />Inspector (473-7357). Call for inspections 24 hours in advance. <br />ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br />in place until final site grading. Approval to pour footings will not be granted until the Inspection Department <br />has verified that primary and alternate sites are adequately protected. <br />NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within20’ <br />of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br />unusable prohibiting the timely completion and or limiting the long term use of the property. <br />A site copy will be available at the City Offices for the septic contractor. <br />CITY OF ORONO <br />Stephen Wq^an, On-site Systems Manager <br />TELEPHONE-473-7357 • FAX-4734)510
The URL can be used to link to this page
Your browser does not support the video tag.