My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
03-16-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:13:49 PM
Creation date
7/27/2023 1:05:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
£ <br />GITYof ORONO <br />Municipal Offices <br />Street Address: <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />Mailing Address: <br />P.O. Box 66 <br />Crystal Bay, MN 55323*0066 <br />February 26,1998 <br />Timothy Sweezo <br />4480 Watertovsn Road <br />Maple Plain, MN 55359 <br />Patrick Brazil <br />Busse Contracting <br />2325 E. 75th Street <br />Inver Grove Heights, MN 55076 <br />Re: Application #2347 - Conditional Use Permit (CUP) for filling at 4480 Watertown Road <br />Gentlemen: <br />The City is in receipt of your application for placement on the Sweezo property approximately <br />53,000 cubic yards of fill from the County Road 6 reconstruction project. This letter is to advise you <br />that additional information is required in order for the application to be considered complete, as <br />follows: <br />1.Wetlands on the site must be delineated by a professional wetland delineator. The <br />delineated boundaries of the large w'etland at the north end of the site, as well as the <br />small pond near the road and any other wetlands on the site, must be shown on the <br />survey. <br />2.The survey must be revised to show the boundaries of the entire property. This is <br />critical in relation to item 3 below. <br />Because the property has a non-compliant septic system which must be replaced in <br />by December 31, 2007, it is critical that future primary and alternate sewage <br />system drainfield sites be identified and confirmed now. You must show that the <br />proposed filling or grading will not occur on drainfield sites that must be preserved <br />for future use. Please contact Septic Systems Inspector Steve Weekman at the City <br />Offices if you have questions about the testing and design process. <br />Telephone (612) 473-7357 • FAX 473-0510 <br />L.
The URL can be used to link to this page
Your browser does not support the video tag.