My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
03-16-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:13:49 PM
Creation date
7/27/2023 1:05:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />1 <br />To:Chairman Smith and Planning Commission Members <br />From:Michael P. Gaffron, Senior Planning Coordinator <br />Date:March 12, 1998 <br />Subject:#2347 - Tim Sweezo, 4480 Watertown Road - Variance and CUP - Public Hearing <br />(To be continued to April 20 meeting) <br />Zoning District: RR-1A Single Family Rural Residential, 5 acre. Unsewered <br />Application: Land alteration CUP and wetland setback variance for placement of approximately <br />53,000 cubic yards of fill on the property, in conjunction with the reconstruction of the Watertown <br />Road / Mculley Road / County Road 6 intersection. The contractor for the road construction, Busse <br />Contracting, is a co-applicant with the homeowner. <br />List of Exhibits: <br />A - Application <br />B - Plat map <br />C - Property Owners List <br />D - Proposed grading plan <br />E - City letter requesting additional information 2-26-98 <br />Application Incomplete <br />After an initial review of what appeared to be a complete application, staff noted the following <br />discrepancies: <br />1. Wetland delineation required in order to proceed with wetland variance. <br />2. Survey must show entire property, not just areas to be filled. <br />3. Extent of proposed grading could have a major impact on future septic sites, <br />and property has a non-conforming system. Need to have septic testing so <br />we know what areas of property to preserve for septic. <br />Applicants were advised that the additional information was needed one week before the March 16 <br />meeting. Such information has not been received as of this writing. <br />Staff Recommendation <br />Table this item and the public hearing to your April 20 meeting. The applicant will be advised that <br />the 60-day statutor>' review period will not begin until the requested information has been received. <br />-■ -I |1 ■
The URL can be used to link to this page
Your browser does not support the video tag.