My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
02-17-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:14:04 PM
Creation date
7/27/2023 1:05:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #2338 <br />February 12, 1998 <br />Page 3 <br />1. <br />2. <br />3. <br />4. <br />The ponds should be graded to include a 10:1 aquatic bench at the normal water level. The <br />bench should be at least 10' in width to provide a vegetative safety buffer. (Note that golf <br />course ponds commonly do not have such a bench at the normal water level, but have <br />relatively steep slopes to allow retrieval of errant balls. There are two potential reasons for <br />the 10:1 bench. The first is clearly as a safety bufTer. The second is that such construction <br />more closely resembles the NURP pond design which allows the vegetated buffer to uptake <br />nutrients and provide better water quality treatment). <br />A potential but not thoroughly discussed benefit to either the applicant and/or the City would <br />be the use of these newly created ponds for wetland credits towards other projects. If these <br />are created as permanent wetlands, such wetland credit might be of value to offset wetland <br />impacts elsewhere. <br />Emergency overflow elevations should be verified and their locations shown on the plans. <br />Note that neither pond has an outlet structure proposed, and it is unclear on the pond near the <br />18th tees as to the absolute overflow' direction. There may be some benefit in forcing that <br />pond to overflow to the large pond rather than to the east, since no dow-nstream residential <br />properties would be impacted by super-storm type flows. The Engineer also notes that <br />erosion control measures should be provided at ihe overflow points. <br />In conjunction with the above, applicant needs to identify the invert elevation for the 12" <br />culvert heading eastward under North Ami Drive from the 18th hole pond. <br />The proposed plans do not indicate any intent to import or e.xport material from the site. If <br />such hauling is expected to occur, spoil site locations and haul routes must be identified. <br />5. Erosion control measures must be in place prior to the start of construction. <br />Conservation and Flowage Easements? <br />The City has neither normally nor consistently required the dedication of conservation and flowage <br />easements over golf course ponds that are created in upland areas not identified as protected <br />wetlands. The golf course ponds are generally decorative in nature, and, as in the current proposals, <br />located in drainage ways or relatively low land areas where maintenance with mow'ing equipment <br />is often liindered by soft ground. In both cases, the proposed wetlands have minimal wildlife value, <br />and are relatively small as compared to most natural wetlands the City has intended to protect. <br />Rather than requiring conservation and flowage easements over these two specific wetlands, staff <br />would recommend that either no wetland easement be required at this time, or that wetland <br />easements be granted over every identifiable wetland on the golf course.
The URL can be used to link to this page
Your browser does not support the video tag.