My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
02-17-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:14:04 PM
Creation date
7/27/2023 1:05:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br />TO: <br />FROM: <br />DATE: <br />Michael P. GafTron, Senior Planning Coordinator <br />Stephen Weckman, On-Site Systems Manager <br />January 9,1998 <br />SUBJECT; Septic Review for applictUon #2321, Don Anderson 905 Old Ciy'stal Bay Rd. S. <br />Sketch Plan Review <br />The proposed eight lot subdivision requires the use of on-site sewage treatment systems. The <br />information submitted to us by Otto Associates is incomplete and will not be acceptable for a final <br />subdivision approval, however, the following is a review of each lot and its potential to have suitable <br />drainfield sites: <br />Lot 1 <br />Soil borings performed by Otto Associates indicates a seasonal water table at 40 to 47 inches, but <br />my soil borings from 1993 indicate a seasonal water table at 30 to 36 inches. Their soil borings <br />indicate that trench systems may be feasible while mine show that a mound system is the only <br />alternative. The soil borings are located in areas where the slope is too steep for the installation of <br />mound systems meeting City Standards. Additional testing would be required to verify whether two <br />mound sites are possible on this lot. <br />Lot 2 <br />Soil borings performed on this lot by Otto Associates indicate a seasonal water table at 38 inches <br />or less and would require the use of mound systems. The slopes on these areas is too steep to allow <br />the use of mound system. Additional testing would be required to determine whether suitable <br />drainfield sites exist on this lot. <br />Lot 3 <br />Soil borings performed by Otto Associates on this lot indicate that mound systems would be <br />required, but slopes throughout the lot are too steep for mound systems. It does not appear that this <br />lot can meet our standards for septic systems. <br />Lot 4 <br />Soil borings by Otto Associates indicate that mound systems must be used on this lot, but the slope <br />direction and narrow lot shape are not favorable for any drainfield site. This lot will not be suitable <br />for septic systems.
The URL can be used to link to this page
Your browser does not support the video tag.