My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-10-2023 Council Packet
Orono
>
City Council
>
2023
>
07-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:27:31 PM
Creation date
7/25/2023 2:20:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 05/11/2023 <br />Date Application Considered as Complete: 05/19/2023 <br />60-Day Review Period Expires: 07/182023 <br /> <br /> <br />To: Chair Bollis and Planning Commission Members <br /> Adam Edwards, City Administrator <br /> <br />From: Natalie Nye, Planner <br /> <br />Date: June 20, 2023 <br /> <br />Subject: #LA23-000022, Michael Clark, 565 Leaf Street, Variance for Accessory Structure Location <br /> <br /> <br />Background <br />The applicant is proposing to construct a new accessory building streetward of the principal building. The <br />proposed building will be used as a garage with an accessory dwelling unit (ADU) on the second floor. The <br />garage will be constructed on the property between the principal building and the street, which is not <br />permitted in the LR-1A zoning district. The applicant is requesting a variance in order to construct the new <br />accessory building streetward of the principal building. All other building setbacks, hardcover, and lot <br />coverage requirements are met. <br /> <br />Practical Difficulties Analysis <br />Applicant Submittal Information: The applicant has identified the placement of the existing home on the <br />property as a practical difficulty. The existing home is situated at the rear of the property. A new accessory <br />building could not be constructed behind the home and therefore the applicant is requesting a variance to <br />allow the construction of the accessory building streetward of the home. Additionally, there are <br />topographical limitations that do not allow for the expansion of the existing attached garage. <br /> <br />Planning Staff Practical Difficulty Analysis: Staff agrees with the applicant’s assessment. The existing home <br />is placed on the rear portion of the lot, 340 feet from the street, which limits the ability to construct an <br />accessory structure in a compliant location. Staff believes the placement of the home and the <br />topographical challenges that limit the expansion of the existing attached garage are practical difficulties <br />supporting the variance request. <br /> <br />LOT ANALYSIS WORKSHEET <br /> <br />Section 78-330 – Accessory Building Setbacks: <br />LR-1A District Accessory Building < 1,000 s.f. Required Proposed <br />Front/Street 50’ 168’ <br />Rear 15’ 252’ <br />North Side 15’ 15.2’ <br />South Side 30’ 126’ <br />*Accessory buildings may not be located streetward of the principal building. <br /> <br />Section 78-350 – Lot Area/Width: <br />LR-1A District Lot Area Lot Width <br />Required 87,120 s.f. (2.0 acres) 200’ <br />Actual 87,123 s.f. (2.0 acre) 200’ <br />Application Summary: The applicant is requesting a variance to construct a new accessory building <br />streetward of the principal building. <br />Staff Recommendation: Planning Department Staff recommends approval.
The URL can be used to link to this page
Your browser does not support the video tag.