Laserfiche WebLink
MAIN FLOOR0"2ND FLOOR10' -6"MAIN CEILING9' -0"2ND CEILING18' -6"GARAGE-7"LOWER CEILING-1' -6"GARAGE TOF-5' -2"LOWER FLOOR-9' -6"CEILING 1215' -6"6' - 8 3/4"7' - 4 3/8"7 5/8"10"11' - 8"13' - 4"8' - 4 5/8"7 3/8"10"A718' - 0"1' - 6"9' - 0"1' - 6"8' - 0"MAIN FLOOR0"2ND FLOOR10' -6"MAIN CEILING9' -0"2ND CEILING18' -6"LOWER CEILING-1' -6"LOWER FLOOR-9' -6"CEILING 1215' -6"6" / 12"12" / 12"1' - 0"A53MAIN FLOOR0"2ND FLOOR10' -6"MAIN CEILING9' -0"2ND CEILING18' -6"LOWER CEILING-1' -6"LOWER FLOOR-9' -6"INSULATED RIM JOISTR-21 SPRAY FOAMSTUCCO SIDING BY MANUIFHOUSEWRAP, 25/32" COMP-OSITION WALL SHEATHING2x6 STUDS @ 16" O.C.INSULATION6 MIL POLY VAPOR BARRIER1/2" GYP. BD.WATERPROOFINGR-10 XPS RIGID INSULATION6" DRAIN TILEW/ SILT SLEEVESET IN GRAVELTO DAYLIGHT ORSUMP3/8" PLYWD. SOFFIT2" CONT. VENTINSULATION BAFFLEENERGY HEELSQUARE CUT FASCIADRIP EDGESEAL-DOWN ASPHALT SHINGLES15# BUILDING FELTICE & WATERSHIELD TO 24" INSIDE WALL5/8" OSB SHEATHING ROOF SHEATHINGMANUFACTURED ROOF TRUSSES @24"R-498" CONC. WALLWITH REINFORCINGTRTD. 2x6 W/SILL SEALER &5/8" A.B. @ 4' O.C.EMBED 7" MIN. IN CONC.1/2" EXPANSION JOINTW/ CAULKING4" CONC. SLAB18" BY MANUF.FLOOR FINISH AS SCHEDULED25/32" T&G OSB FLR SHTNGGLUED AND NAILED5/8" GYP. BD. OVERPOLY VAPOR BARRIERR-5 THERMAX FOIL FACED RIGID INSULFOIL TAPE SEAMS, CALKTO FLOOR8X20" FOOTING TYPWDO UNITS U=0.31 (MAX)R-9 BATTS AT HDRCALK AT JOINTS -PLATE TOFLOOR SHEATHINGWALK OUT AT BEDROOMS ,VERIFY WITH SITE AND GRADINGINSULATED RIM JOISTR-21 SPRAY FOAMR-21FLOOR FINISH AS SCHEDULED25/32" T&G OSB FLR SHTNGGLUED AND NAILEDCALK AT JOINTS -PLATE TOFLOOR SHEATHING18" BY MANUF.DATE:REVISIONS:5757 WENTWORTH AV SOMINNEAPOLIS, MN. 55419P: 612-251-1041WWW.TODDKNUTSONDESIGN.COMJOB NO:SHEET NO:TODD KNUTSON DESIGNCONTRACTOR TO VERIFYALL DIMENSIONS, AS BUILTCONDITIONS (IF APPLY) ANDSITE CONDITIONS, BEFOREORDERING MATERIAL ORDEMOLISHING EXISTINGSTRUCTURES. CONTRACTORAND ALL SUBS MUST REPORTANY DISCREPANCIES TODESIGNER IMMEDIATLY. ASBUILT AND SITE CONDITIONS OFTEN HAVE UNIQUE CON-DITIONS THAT CANNOT BEPREDICTED OR FORSEEN ATDESIGN COMPLETION. CONTRACTOR, SUBS ANDDESIGNER WILL WORK TOGETHER TO REACH A SOLUTION IF ANY SITUATION MAY ARISE.TERMS:5/22/2023 9:31:30 PMA53502023-01-27350 Crestview AvSECTIONS3/16" = 1'-0"A51Section 13/16" = 1'-0"A52Section 2REVISED 2023-02-07REVISED 2023-02-22REVISED 2023-03-023/8" = 1'-0"A53Section 2 - Callout 1ISSUED 2023-03-09REVISED 2023-05-22