My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2015 Council Packet
Orono
>
City Council
>
1950-2024
>
2010-2019
>
2015
>
09-14-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 11:30:45 AM
Creation date
10/1/2015 11:19:56 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, August 24, 2015 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 11 of 13 <br /> <br /> <br />McMillan indicated she is in agreement with that. <br /> <br />Gaffron stated Staff can do that. <br /> <br />Levang stated that would also help the Council determine whether the four units are necessary. <br /> <br />Gonyea stated he will get together with the builder and come up with a revised concept plan depicting the <br />home sizes. <br /> <br />The City Council took no formal action on this item. <br /> <br />PUBLIC WORKS DIRECTOR/CITY ENGINEER’S REPORT <br /> <br />Public Works Director/City Engineer Edwards stated a neighborhood meeting was held with the Baldur <br />Park residents. The project will result in some restricted access in the middle of the road that is expected <br />to last for approximately three days. The work is scheduled to start next Monday. <br /> <br />In addition, the Public Works Department has repainted the crosswalk lines on Old Crystal Bay Road and <br />installed experimental flashing LED stoplights to bring some more visibility to the crosswalks. <br /> <br />The Public Works Department is continuing with the sewer cleaning, which is nearing completion. <br />Edwards indicated the area highlighted in green was completed this year. Edwards stated the Public <br />Works Department has also been doing some minor erosion repair along various streets as part of the <br />storm sewer cleanout. <br /> <br />Edwards stated the side of the post office has been painted by the STS crew. The park signs have also <br />been given a fresh coat of paint. Edwards stated the Parks Commission had suggested that some <br />recycling containers also be placed at some of the parks. The City’s trash contractor has been requested <br />to place some recycling containers at Navarre, Bederwood and Summit to see how those work out. The <br />Public Works Department will be continuing with some work at Lydiard Beach and the other <br />beautification items requested by the Park Commission. <br /> <br />Edwards indicated he will be receiving a quote from the consulting engineer to conduct a survey on <br />Lydiard Beach and that he will be meeting with him next week. Edwards stated it is his understanding <br />there is a 3 to 5-foot buffer near the channel that is owned by a private property owner. <br /> <br />McMillan stated there also appears to be an issue with fishing on the adjoining property as well. <br /> <br />Levang asked if the City paid for the new LED stop sign. <br /> <br />Edwards stated four signs in total were erected and that the City paid for two and the school district paid <br />for two. <br /> <br />*5. PUBLIC WORKS MAINTENANCE WORKER APPOINTMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.