Laserfiche WebLink
BP <br />d and existing <br />)division <br />Ln the City; <br />1 subdivision <br />City of Orono <br />esota, subject <br />location of <br />>' lakeshore <br />pproved, <br />lands and any <br />Ld subdivisicn <br />[n that event, it <br />r subdivision <br />7 <br />Am....f,•Vi-.d <br />V- <br />' ^ -J <br />4 <br />Planning Commission Members <br />Jeanne A. Mabusth, Zoning Administrator <br />April 15, 1983 <br />#741 - William Sinclair, 1360 Cherry Place <br />Conditional Use Permit <br />- Variance & <br />Zoning District - LR-IB <br />Area - 0.53 acre or 23,940 sq. ft. <br />a?^^Variance - 31.983 - Excavation within the 75' setback protected area <br />b) Conditional^UsI^'permit^n.TOO - Major land alteration anywhere in tl^ <br />requires a conditional use permit <br />The Sinclairs must replace the existing, unstable section of foundation <br />under the livingroom area of their house in order to stabilize the <br />now shifting foundation. Their home is of modest size and they require <br />additional living area. Their choices are either ^ ®sectionaddition on the north side of the house or at the time the lakesiae seccion <br />of foundation is replaced to dig out around the <br />bri^avatef (960 contour through 954 contour) - | <br />r^f six feet of earth - a total 600 cubic yards of fill - 60 tandem sizea <br />dump truck loads. In creating the walkout, ^he steep lakeshore bank wx <br />be cut back and allow for a more graduated access to the lake <br />removal of upper sections of the existing access stairs. <br />After Planning Commission action, the applicants must file for a Minnehaha <br />Creek Watershed District premit. <br />in consideration of similar applications reviewed last V®"' <br />Zoning Administrator, I have appreciated the to stop <br />consulted with staff and sought advice rather than staff ^ <br />construction when the simple foundation tJJe-ftct^land alteration and we are once again reviewing an after the fact <br />application. <br />unfortunately, I have had to postpone several schedj^ed site inspections <br />of the oroperty because of rather unusual spring-time weather, we wiii oe <br />?rudglnr?hrought the snow drifts on Friday and at least his oral comments <br />and answers to my questions will be presented at the meeting. <br />In consideration of the plan presented for this review, my questions are <br />as follows: <br />1 There is no information on temporary erosion control devices - how do <br />they plan to protect the lakeshore during construction? <br />BOSk <br />I <br />■ :■ '-r <br />14. <br />It <br />p. <br />f <br />/V. <br />s> <br />#741 - Wil <br />April 15, <br />Page 2 <br />2.Is Coc <br />af feci <br />lines <br />3.What <br />the d <br />4. Does <br />banks <br />If Plann; <br />engineer <br />if the c< <br />1. NO i <br />2. Cont <br />3. PtOF <br />drai <br />4. Pro^ <br />upp<