My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-18-1983 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1983 Planning Packets
>
04-18-1983 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2023 12:11:46 PM
Creation date
7/13/2023 8:53:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />rision <br />>4- <br />3 make the following <br />I <br />adequate working <br />leeded pumpout and <br />tiis system is scheduled <br />”.sts;;>ck and Associates <br />the average was 61mpi# <br />> -4 <br />“ ISIS? <br />dicates that standard <br />" 1 <br />V- <br />1 lot between the <br />e possibilities for <br />rainfield sites. <br /><: <br />f! <br />,4 <br />I <br />f <br />ji <br />I <br />TO:Planning Commission Members <br />FROM:Jeanne A. Mabusth, Zoning Administrator <br />DATE:April 14, 1983 <br />SUBJECT:#740 - Edward T. Lehman - 2450 Carman Street <br />Variance <br />- Renewal <br />Zoning District - LR-IC <br />Area - 21,200 sq. ft. (16,930 sq. ft. dry) <br />Application - Setback variances <br />a) Street setback - 30* <br />Proposed setback - 20' <br />Variance setback - 10* or 33 % <br />Lakeshore Setback <br />Required - 75* <br />Proposed - 50 * <br />Variance - 25* or 33% <br />List of Exhibits <br />Exhibit A - Application <br />Exhibit B - Property Owners List <br />Exhibit C - Plat Map <br />Exhibit D - Council Minutes - December 12, <br />Exhibit E - Survey <br />Exhibit F - Floor Plan <br />Exhibit G - Foundation Plan <br />Exhibit H - Elevations <br />1977 <br />in December of 1977, Council approved street and lakeshar^: setback <br />for Lot 3 of the Lehman Addition (see Exhibit ^ The <br />current subdivision proposal provides Lot 3 with more area but it <br />does not improve the building envelope. The lot still requires variances <br />even for an average sized house. Lehman's proposal is for a modest size <br />home that meets the previous approved setbacks. <br />Note on Exhibit F, that the applicant proposes a deck along the lagoon. <br />In my outline of the house within the building envelope, the deck area <br />was not included because the main structure just made the approved setback <br />limits. The deck should be located on the south side of the house. <br />Staff recommendations; <br />To approve Edward T. Lehman's renewal variance application of a street <br />setback variance of 10* and lakeshore setback variance of 25* based on <br />the following hardships: <br />'' '!<' ■
The URL can be used to link to this page
Your browser does not support the video tag.