Laserfiche WebLink
Lakeview - Final Plat Review <br />May 21, 2015 <br />Page 2 <br /> <br />Covenants, Conditions, Restrictions and Easements <br />The applicants have submitted an updated draft Declaration of Covenants, Conditions, <br />Restrictions and Easements, attached as Exhibit C. <br />The City will be granted specific easements and covenants regarding the private road, the <br />wetlands, and the conservation area, in separate documents not subject to potential future <br />amendment by the HOA, to guarantee the permanence of the various provisions. <br />Stormwater Management <br />In the initial development plans, stormwater management was primarily being handled by <br />establishment and maintenance of the conservation areas in natural vegetation to act as a <br />filtration system, with no NURP ponding proposed. The plans reviewed by the Council in <br />March included 4 ‘biofiltration basins’ or dry ponding areas, clustered around the area where the <br />outlet to the large existing pond will flow under the main road through culverts. Since then the <br />MCWD has required the developers to incorporate additional such basins (for a total of 16) <br />scattered throughout the development area at locations where runoff from the new streets can be <br />captured and held for infiltration. The locations can be found on Sheets C401 thru C406; pond <br />design details are depicted on Sheets C601/602/603 of the attached plan set. <br />The low area in the northwest corner of the property may have been a wetland prior to <br />construction of the golf course in the 1950s. When the course was built that area was drained <br />with underground tiling. While a formal restoration of this wetland is not proposed and not <br />required by MCWD, the plan is to remove the draintiles and allow the low area to revert to a <br />natural state. The low land is within the defined Conservation Area. <br />Applicants have been working closely with MCWD regarding stormwater management, and final <br />MCWD Board approvals are expected to be granted on May 28. The MPCA has approved the <br />SWPPP/NPDES permit for the site. <br />City Engineer Comments <br />The development plans have undergone a number of minor engineering revisions since March, <br />based on comments from the MCWD and the City Engineer. Staff and Bob Bean from Bolton & <br />Menk met with the applicants on May 20 to review Bob’s most recent engineering comments <br />(see Exhibit E). It appears that all engineering issues have been or are in the process of being <br />addressed and will be resolved to allow for Final Plat Approval at the June 8 Council meeting. <br />Development Agreement <br />A draft of the Development Agreement drafted by the City Attorney and staff has been reviewed <br />by the applicants and is attached as Exhibit F. <br />Private Road Names <br />The proposed private road names include Lakeview Parkway for the main road, with cul-de-sacs <br />proposed to be known as Augusta Street; St. Andrews Street; Lakeview Court; and Pinehurst <br />Court (previously labeled as Quail Hollow Avenue). <br /> <br /> <br /> <br />Entire Council Packet 05/26/15 [Page 90 of 378]