Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br />DATE: May 26, 2015 <br />ITEM NO: <br />___________________________________________________________________________________________ <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards JML Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer’s Report <br />____________________________________________________________________________________ <br />Item Description: Watertown Road Joint Powers Agreement <br />_____________________________________________________________________________________ <br />List of Exhibits <br />A- Joint Powers Agreement <br />B- Project Area <br />1.Purpose. The purpose of this action item is to gain Council approval to enter into a Joint Powers <br />Agreement (JPA) with the City of Long Lake to rebuild our shared portion of Watertown Road. <br />2.Background. Watertown Road is a Collector road for the City of Orono. From Willow Road to <br />Brown Road responsibility for its care is shared with the City of Long Lake due to the alignment of the <br />cities’ boundaries. (See Exhibit B) Orono owns 29.5% of the road surface by square footage along this <br />stretch of road with Long Lake owning the remainder. Long Lake is proposing to rebuild this section of <br />the road in 2016 and is looking to partner with Orono to do so. Long lake is considering a complete <br />rebuild of the road because they may replace all of the utilities that currently run under this section of <br />Watertown Road. Orono does not have any utilities under this section of Watertown road. At the <br />February 23rd Work Session the Council provided direction to staff to use reclamation costs as a basis for <br />Orono’s cost share in the project. On May 19th the Long Lake City Council moved to approve the <br />attached JPA (See Exhibit A). <br />3.JPA Summary. The JPA authorizes long lake to manage the project with Orono participating through <br />funding. Both City Councils will have to approve the final plans and the award of the project. <br />4.Cost. Per the JPA Orono shall contribute to 29.5% of the feasibility report, 29.5% of a surface, storm <br />sewer storm water management, construction administration and materials testing costs up to $133,800. <br />5.Funding. The project would be funded from the Pavement Management Fund. <br />6.Timing. Below is a revised timeline for the project. <br />What When <br />Execute JPA (Long Lake/Orono) May, 2015 <br />Receive Feasibility Report (Long Lake/Orono) September, 2015 <br />Design (Long Lake/Orono) October, 2015 <br />Receive Bids February, 2016 <br />Construction Summer 2016 <br />COUNCIL ACTION REQUESTED: <br />Move to approve the Water town Road Reconstruction JPA with Long Lake. <br />10 <br />Entire Council Packet 05/26/15 [Page 331 of 378]