My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-26-2015 Council Packet
Orono
>
City Council
>
2015
>
05-26-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 10:06:51 AM
Creation date
10/1/2015 9:59:57 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Funding. The project could be funded with a combination of the FEMA funds provided and utilizing <br />remaining 2014 General Fund Balance. <br />Funding Source Balance <br />FEMA $ 59,223 <br />General Fund Balance $ 156,000 <br />TOTAL AVAILABLE $ 215,223 <br /> <br />6. Timing. The funds provided by FEMA are required to be used within 18 months of their approval. <br />The upcoming 2015 construction season is the best opportunity to use the FEMA funds within the <br />designated window. Below is the revised timeline for the project: <br />When What <br />Engineer Services Proposal to Council March 2015 <br />Design-Bid Phase March–June 2015 <br />Contract Award July 2015 <br />Construction Complete October 2015 <br /> <br />COUNCIL ACTION REQUESTED: <br />Move to approve design option 3, Partial Depth Reconstruction. <br />Entire Council Packet 05/26/15 [Page 326 of 378]