Laserfiche WebLink
Drawings(1) for 1 Ton Vertical - RH <br />314 VIEW - RIGHT HAND RETURN UNIT <br />TOP VIEW <br />w� <br />�z <br />9.3 ¢ z <br />xw / <br />�O <br />0 <br />4.9 <br />• <br />2.5 4.8 As• <br />• <br />19A�19.0 17.3 1.8 <br />2.0 RETURN 12 <br />1.7 <br />+ .0 <br />0 <br />12.0 <br />9.325 [C] 2.7 9.0 <br />]B] q D [E] <br />1.3 FRONT VIEW 1.6 RIGHT VIEW <br />NOTES <br />[A] -High Volt Pwr Entry 1.1 DIA [B] -Low Volt Pwr Entry 08 DIA [C] -Condensate Drain 3!4" FPT <br />[D] -Supply Water 112" FPT [E] - Return Water 112" FPT [F] -Unit Front Service Clearance 24 <br />Product Drawing UInitTag: 1TonVertical-RH FDAIKIN <br />Product: Project Name: Brackets Point House <br />13600 Industrial Park Blvd. Minneapolis, MN 55441 <br />Model: WGCV012 Sales office: Schwa b-VolIhaber-Lubratt, www.DaikinApplied.com Software Version: 10.20 <br />Sales Engineer: Addi Steinert Aug. 30, 2021 Ver/Rev: Sheet 1 of 1 Scale: NTS Tolerance: +/-0.25" Dwg Units: (in) <br />No change to this drawing may be made unless approved in writing by Daikin Applied. Purchaser must determine that the equipment is fit and sufficient for the job specifications. <br />Job Number: <br />LL20FE <br />Page <br />24 <br />11.1 <br />Job Name: <br />16.5 <br />13.6 <br />OPENING <br />9.9 <br />6 of 25 <br />www.DaikinApplied.com <br />Job Number: <br />LL20FE <br />Page <br />Prepared Date: 8/30/2021 <br />Job Name: <br />Brackets Point House <br />6 of 25 <br />www.DaikinApplied.com <br />