Laserfiche WebLink
ILS W-117z[s)[i=3 <br />WINDMILLER DESIGN STUDIO, LLC. ASSUMES NO <br />THESE PLANS INDICATED CONCEPTUAL TRUSS CONFIGURATIONS AND <br />GENERAL FRAMING INFORMATION: <br />RESPONSIBILITY FOR STRUCTURAL OR DIMENSIONAL <br />PLANS ARE TO BE DESIGNED AND ENGINEERED BY THE MANUFACTURER <br />ERRORS OR OMISSIONS. WINDMILLER DESIGN <br />LICENSED TO PRACTICE WITHIN THE STATE OF THE PROJECT, PRIOR TO <br />ALL WOOD FRAMING TO COMPLY WITH APPLICABLE STATE AND LOCAL <br />STUDIO, LLC. ASSUMES NO RESPONSIBILITY FOR THE <br />1. IMPORTANT: ALL DIMENSIONS ARE ±. GENERAL <br />BUILDING CODES AND THE NATIONAL DESIGN SPECIFICATIONS FOR WOOD <br />WORKMANSHIP OF THE SUB -CONTRACTORS. THE <br />NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES FROM THESE PLANS. <br />CONSTRUCTION PUBLISHED BY THE NATIONAL FOREST PRODUCTS <br />CONTRACTOR AND/OR OWNER MUST VERIFY AND <br />CONSTRUCTION. <br />ASSOCIATION(NFPA) <br />CHECK ALL NOTES, DETAILS, ELEVATIONS, SECTIONS <br />ETC. NECESSARY FOR INSTALLATION. <br />2. ALL DIMENSIONS TO FRAMING & EXTERIOR <br />AND FLOOR PLANS AND NOTIFY WINDMILLER DESIGN <br />SHEATHING UNLESS OTHERWISE NOTED. <br />IMPORTANT: ALL DIMENSIONS ARE ±. GENERAL CONTRACTOR TO FIELD <br />STUDIO, LLC. OF ANY ERRORS OR OMISSIONS FOR <br />LVL LUMBER PROPERTIES: <br />VERIFY ALL EXISTING SITE CONDITIONS PRIOR TO COMMENCEMENT OF <br />POSSIBLE CORRECTION PRIOR TO THE START OF <br />SCALED DRAWINGS. <br />CONSTRUCTION. <br />CONSTRUCTION. <br />E = 1,900,000 PSI <br />4. ALL STRUCTURAL COMPONENTS & CONNECTIONS <br />ROOF PLAN NOTES: <br />- TYPICAL ROOFING SYSTEM SHALL BE AS FOLLOWS: ASPHALT ROOF SHINGLES, <br />ROOFING FELT/SELF ADHERED ROOFING UNDERLAYMENT OVER ROOF <br />SHEATHING. <br />- STANDING SEAM METAL ROOF SYSTEM SHALL BE AS FOLLOWS: PREFORMED <br />STANDING SEAM METAL PANELS, RED ROSIN PAPER, ROOFING FELT/SELF <br />ADHERED ROOFING UNDERLAYMENT OVER ROOF SHEATHING. <br />- METAL PANS WHERE INDICATED SHALL BE FLAT SOLDERED SEAMED COPPER <br />OVER W.R GRACE "ULTRA" SELF ADHERED ROOFING UNDERLAYMENT. IF FIELD <br />SEAMING IS PERFORMED PLACE 2 LAYERS ROOFING FELT UNDER SEAM <br />LOCATIONS TO PROTECT UNDERLAYMENT. <br />- ROOFING FELT SHALL BE UL RATED 30 LB ASPHALT SATURATED ORGANIC <br />FELT. <br />-TYPICAL SELF ADHERED ROOFING UNDERLAYMENT SHALL BE W.R. GRACE <br />"ICE AND WATER SHIELD." INSTALL AT FOLLOWING LOCATIONS; 1) ALONG <br />EAVES EXTENDING A MINIMUM OF 36" HORIZONTALLY UP ROOF BEYOND THE <br />INSULATED WALL LINE, 2) 36" SHEET WIDTH ALONG GABLE (RAKE) ENDS, 3) <br />36" SHEET WIDTH AT VALLEYS, 4) 36" SHEET WIDTH AT ROOF/WALL <br />INTERSECTIONS, 5) ALL AROUND CHIMNES, SKYLIGHTS, AND OTHER ROOF <br />PENETRATIONS, 6) COMPLETELY AT ALL ROOFS LESS THAN 4:12 PITCH, 7) 26: <br />SHEET AT ROOF PITCH TRANSITIONS, 8) OTHER AREAS AS REQUIRED BY CODE <br />- INSTALL PREFINISHED METAL DRIP FLASHING ALONG ALL EAVES AND RAKE <br />ENDS TO HAVE MINIMUM 6" FLANGE ONTO ROOF SURFACE. <br />- INSTALL PREFINISHED METAL VALLEY FLASHING WITH 1" V -CRIMP, <br />12" MINIMUM UP EACH SIDE OF VALLEYS OR WEAVE SHINGLES AT VALLEYS. <br />INSTALL PREFINISHED METAL FLASHING AT ROOF PITCH TRANSITIONS <br />- INSTALL PREFINISHED METAL FLASHING ALONG ROOF/WALL INTERSECTIONS <br />AND ALONG ROOF/CHIMNEY INTERSECTIONS. <br />- CONFORM WITH "SMACNA" ARCHITECTURAL SHEET METAL MANUAL, LATEST <br />EDITION FOR ALL METAL ROOFING, FLASHING, AND ROOF PENETRATION <br />SYSTEMS. <br />- RIDGE VENTS TO BE HIGH PROFILE, PLASTIC TYPE, SHINGLE OVER VENT <br />SYSTEM (COR -A -VENT V-600 SERIES OR EQUAL). INSTALL CONTINUOUSLY <br />ALONG RIDGES. <br />- INSTALL ROOF TO WALL VENTS (COR -A -VENT ROOF -2 -WALL VENT OR EQUAL) <br />WHERE INDICATED ON DRAWINGS. <br />- NOT ALL ROOF PENETRATIONS ARE INDICATED ON THESE DRAWINGS. <br />COORDINATE FLUES, DRYER VENTS, PLUMBING STACKS, ETC. AND PROVIDE <br />ACCESSORIES AND INSTALLATION AS REQUIRED. ALL PENETRATIONS SHOULD <br />BE PLACED ON REAR SIDE OF ROOF IF POSSIBLE. REVIEW ALL PENETRATION <br />LOCATIONS IN FIELD WITH OWNER. <br />IMPORTANT NOTE FOR CONTRACTORS AND <br />SUBCONTRACTORS: <br />1. THESE DRAWINGS ARE DESIGN DRAWINGS. THE GENERAL CONTRACTOR <br />HAS THE RIGHT AND RESPONSIBILITY TO REVISE CONFIGURATIONS AND <br />DETAILS DEPICTED IN THE ARCHITECT'S DESIGN DRAWINGS, AS REQUIRED, <br />TO PROPERLY CONSTRUCT A TECHNICALLY SOUND PROJECT. <br />2. THE GENERAL CONTRACTOR IS TO NOTIFY THE ARCHITECT WHEN DEVIATING <br />FROM THE DESIGN INTENT. <br />3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL <br />COVENANTS, ZONING, BUILDING, FIRE, HEATING, PLUMBING, AND <br />ELECTRICAL CODE REQUIREMENTS. <br />*PROVIDE SELF SEALING <br />ASPHALT MEMBRANE (ICE <br />SHIELD) AT ALL VALLEYS SELF SEALING <br />ASPHALT MEMBRANE <br />\ (ICE SHIELD) -FIRST <br />(2)ROWS <br />15 LB. ASPHALT <br />ROOFING FELT <br />ASPHALT SHINGLES <br />AS SPECIFIED <br />9" SHINGLE STARTER <br />PREFINISHED METAL <br />EDGE <br />DETAIL AT TYPICAL ROOF EDGE <br />1 /2II _ v_0lI <br />© 2023 Windmills, Dssign Studio. <br />Rep,od"dion solely by Windmillo, Design Studio. <br />952.250.1941 <br />W INDMILLERDESIGNSTUDIO.COM <br />Lu �10 <br />Ln <br />^ co <br />VLn <br />Ln <br />\ Z <br />1� <br />\ O <br />C= <br />0 <br />'^) <br />V O <br />Y N <br />i <br />I..L V) <br />4J <br />J <br />Ln <br />U Ln <br />NM <br />ERRORS OS OMISSIONS, <br />RESIGN STUGIO, LLC, <br />ASSUMES NO RE-SIBILIiY FOR <br />rvS.— <br />H DIO Sw ErvEREMUST <br />o GRED ALLNOTEs. <br />EAI LS,AryELEVATIONS, SECTIONS <br />All <br />seROCONR nory_OR TO <br />THE START OF CON- <br />I. <br />ISSUE DATE <br />FARWRAWA <br />BUILDING <br />DETAILS <br />THESE PLANS INDICATED CONCEPTUAL TRUSS CONFIGURATIONS AND <br />LOADING CONDITIONS. ALL FLOOR AND ROOF TRUSSES INDICATED ON THESE <br />PLANS ARE TO BE DESIGNED AND ENGINEERED BY THE MANUFACTURER <br />GENERAL NOTES: <br />LICENSED TO PRACTICE WITHIN THE STATE OF THE PROJECT, PRIOR TO <br />CONSTRUCTION VERIFY ALL POINT LOAD AND BEARING CONDITIONS AND <br />1. IMPORTANT: ALL DIMENSIONS ARE ±. GENERAL <br />COORDINATE POSTS AND BEARING REQUIREMENTS WITH THE BUILDER. <br />CONTRACTOR TTOR TO FIELD VERIFY ALL EXISTING SITE <br />NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES FROM THESE PLANS. <br />CONDITIONS PRIOR TO COMMENCEMENT OF <br />FOLLOW MANUFACTURERS RECOMMENDATIONS AND REQUIREMENTS FOR <br />CONSTRUCTION. <br />AND FURNISH ALL BLOCKING, STIFFENERS, BRACING, FASTENERS, HARDWARE, <br />ETC. NECESSARY FOR INSTALLATION. <br />2. ALL DIMENSIONS TO FRAMING & EXTERIOR <br />SHEATHING UNLESS OTHERWISE NOTED. <br />ALL CONVENTIONAL LUMBER TO BE HEM -FIR #2 GRADE OR BETTER. MINIMUM <br />LVL LUMBER PROPERTIES: <br />3. ALL DIMENSIONS HAVE PRECEDENCE OVER <br />Fb = 2,600 PSI <br />SCALED DRAWINGS. <br />Fv = 285 PSI <br />E = 1,900,000 PSI <br />4. ALL STRUCTURAL COMPONENTS & CONNECTIONS <br />TO BE ENGINEERED BY SUPPLIER. <br />UNLESS NOTED OTHERWISE: EXTERIOR WALLS (INCLUDING GARAGE WALLS) <br />TYPICALLY TO BE 2X6 CONSTRUCTION, INTERIOR WALLS TYPICALLY TO BE 2X4, <br />5. ALL WINDOW HEADERS TO BE 2- 2X1 O'S UNLESS <br />INTERIOR WALL WITH POCKET DOORS TO BE 2X6 CONSTRUCTION. POCKET <br />OTHERWISE NOTED. <br />DOORS TO BE CUSTOM FABRICATED WITH'TIMBERSTRAND ENGINEERED <br />FRAMING". CABINET WALLS AND BALLOON FRAMED WALLS SHALL BE FRAMED <br />6. ALL WOOD ABUTTING CONCRETE TO BE TREATED. <br />WITH'TIMBERSTRAND'. <br />7. ALL ANGLES TO BE 45 DEGREES UNLESS <br />PLAN DIMENSIONS ARE TYPICALLY TAKEN TO OUTSIDE OF WALL SHEATHING AT <br />OTHERWISE NOTED. <br />EXTERIOR WALLS AND TO CENTER LINES OF FACE OF STUD AT INTERIOR <br />WALLS. <br />8. GENERAL CONTRACTOR TO INSTALLALL <br />PRODUCTS PER MANUFACTURERS' <br />COLUMN SIZES SHALL NOT EXCEED CRUSHING STRENGTH OF THE PLATES <br />RECOMMENDATIONS. <br />THEY BEAR ON- SIZE AS REQUIRED. UTILIZE SQUASH BLOCKING OR BEAR <br />DIRECTLY ON FOUNDATION. <br />9. GENERAL CONTRACTOR SHALL NOT COMMENCE <br />WORK UNDER THIS CONTRACT PRIOR TO <br />USE PRESERVATIVE TREATED COLUMNS, BEAMS, PLATES, MISC. FRAMING <br />SUBMITTING PROOF OF INSURANCE AND <br />MEMBERS AS REQUIRED BY CODE AND AS CALLED OUT IN PLANS. <br />APPROVAL OF THE OWNER. <br />WHERE WOOD FRAMING SIZES ARE INDICATED, MANUFACTURER TO VERIFY <br />10. GENERAL CONTRACTOR AND HIS <br />GRADE AND SPACING REQUIRED TO MAINTAIN MINIMUM L/480 DEFLECTION. <br />SUBCONTRACTORS SHALL OBTAIN ALL REQUIRED <br />PERMITS BEFORE STARTING THE WORK, AND <br />ALL FLOOR BEAMS TO BE SET FLUSH WITH FLOOR FRAMING UNLESS <br />OBTAIN SIGN -OFFS UPON COMPLETION OF THE <br />INDICATED OTHERWISE. <br />WORK. <br />ALL ROOF BEAMS TO BE DROPPED UNLESS NOTED OTHERWISE <br />11. GENERAL CONTRACTOR SHALL PROVIDE ALL <br />LABOR, MATERIALS AND SERVICES NECESSARY <br />DROPPED FLOOR BEAMS OR ROOF BEAMS SHALL BE 12" MAXIMUM DEPTH <br />TO COMPLETE THE ENTIRE SCOPE OF WORK, AND <br />UNLESS NOTED OTHERWISE. <br />SHALL COORDINATE ALL TRADES, MATERIAL <br />DELIVERY SCHEDULES, ETC. TO PERFORM THE <br />SILL PLATES SHALL BE 2X6 MINIMUM. ANCHOR BOLTS SHALL BE 1/2" MIN. <br />JOB IN THE MOST EXPEDITIOUS MANNER. <br />DIAMETER (U.N.O.) CAST IN PLACE WITH T EMBED. ANCHOR BOLTS SHALL <br />HAVE 2" DIA. X 0.125" THICK WASHERS TIGHTENED AND COUNTERSUNK 1/4" <br />12. GENERAL CONTRACTOR SHALL BE RESPONSIBLE <br />INTO THE TOP OF THE SILL PLATE. SPACING SHALL BE 48" O.C. WITH A MIN. OF <br />FOR THE SECURITY OF ALL BUILDING MATERIALS <br />TWO BOLTS PER PIECE WITH BOLT LOCATED NO MORE THAN 12" OR LESS THAN <br />AND FIXTURES DURING CONSTRUCTION AND <br />4" FROM EACH END OF EACH PIECE. <br />PROVIDING ALL NECESSARY PROTECTION TO <br />EXISTING OCCUPIED AREAS. <br />AT TILED FLOOR AREAS USE MUDSET METHOD AND DEPRESS FLOOR <br />SHEATHING SO IT IS FLUSH WITH TOP OF FLOOR FRAMING (SHEATHING IN <br />13. GENERAL CONTRACTOR SHALL PERFORM DAILY <br />BETWEEN FRAMING MEMBERS) <br />CLEAN-UP OF THE JOB SITE. <br />WINDOW DESIGNATIONS ON PLANS INDICATE FRAME WIDTH X HEIGHT. VERIFY <br />14. GENERAL CONTRACTOR SHALL PERFORM FINAL <br />ROUGH OPENING SIZES WITH WINDOW MANUFACTURER. <br />CLEAN-UP OF THE SITE UPON COMPLETION OF <br />THE WORK. <br />ASA MINIMUM, UNLESS SHOWN OTHERWISE ON PLANS, PROVIDE DOUBLE <br />STUD AT ALL HEADER AND LINTEL SUPPORTS (ONE FULL HEIGHT KING STUD <br />15. GENERAL CONTRACTOR TO COMPLY WITH ALL <br />AND ONE JACK STUD) <br />LOCAL, STATE AND FEDERAL CODES. <br />16, THE PREVAILING BUILDING CODE IS THE <br />RESIDENTIAL BUILDING CODE (RBC) . <br />SHEATHING: <br />17. CONSTRUCTION SHOULD BE PERFORMED TO <br />ALL EXTERIOR WALLS TO HAVE CONTINUOUS PLYWOOD WALL SHEATHING. <br />CURRENT STATE OF MINNESOTA BUILDING & <br />EACH PANEL OF SHEATHING SHALL BE IDENTIFIED WITH THE APPROPRIATE <br />ENERGY CODES AND LOCAL INDUSTRY <br />GRADE - TRADEMARK OF THE AMERICAN PLYWOOD ASSOCIATION. <br />STANDARDS AND STANDARD INDUSTRY <br />PRACTICES. <br />PROVIDE 1/8" SPACE AT EDGES AND ENDS OF EACH SHEET OR AS REQUIRED <br />BY THE MANUFACTURER. <br />18. ALL WINDOWS & DOORS SHOULD BE INSTALLED <br />PER MANUFACTURERS INSTALLATION <br />GRADE AND TYPE SHALL BE AS FOLLOWS: <br />REQUIREMENTS AND THE MINNESOTA LATH AND <br />ROOF SHEATHING: 40/20 APA RATED SHEATHING EXPOSURE 1 <br />PLASTER BUREAU REQUIREMENTS. <br />EXTERIOR WALL: 24/16 APA RATED SHEATHING EXPOSURE 1 <br />FLOORS: 48/24 APA RATED SHEATHING EXPOSURE 1 (T&G) <br />19. ALL WEATHER RESISTIVE BARRIERS SHOULD BE <br />INSTALLED PER IRC SEC. R703.2 AS AMENDED BY <br />5/8" MINIMUM ROOF SHEATHING TO BE ATTACHED WITH 0.113" DIAMETER NAILS <br />THE STATE OF MINNESOTA RULES SECTION <br />AT 6" O.C.; EDGE, 12" O.C. FIELD. PROVIDE 6" O.C. NAILING TO ALL MEMBERS IN <br />1309.0707 <br />LINE WITH SHEAR WALLS. EDGE FASTENERS SHOULD BE PLACED 3/8" FROM <br />PANEL EDGES AND ENDS OR AS REQUIRED BY THE MANUFACTURER. <br />20. ENGINEERING- ALL HVAC, PLUMBING, <br />ELECTRICAL, SOILS AND STRUCTURAL <br />3/4"MINIMUM FLOOR SHEATHING TO BE GLUED AND ATTACHED WITH 0.113" <br />ENGINEERING AND DESIGN SHALL BE PROVIDED <br />DIAMETER NAILS @ 6" O.C. EDGE, 12" O.C. FIELD. <br />BY THE RESPECTIVE SUBCONTRACTOR/SUPPLIER <br />OF THOSE SYSTEMS AND COORDINATED BY THE <br />1/2" MINIMUM PLYWOOD EXTERIOR WALL SHEATHING TO BE ATTACHED WITH <br />GENERAL CONTRACTOR. INFORMATION HEREIN <br />0.113" DIAMETER NAILS AT 6" OC.; EDGE, 12" O.C. FIELD UNLESS OTHERWISE <br />SHOWN IN THESE REGARDS IS PROVIDED FOR <br />NOTED ON PLANS. <br />CLARIFICATION OF THE OVERALL PROJECTS <br />DESIGN INTENT ONLY. <br />INTERIOR SHEAR WALLS TO HAVE 5/8" GYPSUM SHEATHING BOTH SIDES OF <br />WALLATTACHED WITH 6d COOLER NAILS OR WALLBOARD NAILS AT 7" O.C. <br />21. PRODUCT INFORMATION- PROVIDE SAMPLES <br />EDGE, 12" O.C. FIELD UNLESS NOTED OTHERWISE ON PLANS. <br />AND SHOP DRAWINGS FOR ALL MATERIALS AND <br />FABRICATED ITEMS TO THE EXTENT THE OWNER <br />SPLICE ALL SHEATHING ON A COMMON MEMBER SO AS TO PROPERLY <br />HAS FULL UNDERSTANDING OF THE PRODUCTS <br />TRANSFER SHEAR FORCES. <br />AND/OR DESIGN OF. <br />ALL SHEATHING NAILING TO BE COMMON WIRE OR GALVANIZED NAILS. <br />22. SPECIFICATIONS- CONTRACTOR SHALL <br />DISCLOSE TO THE OWNER AND COORDINATE ALL <br />SPECIFICATIONS OF ALL ASPECTS OF THE WORK <br />THAT ARE NOT INDICATED IN THE DRAWINGS OR <br />CONCRETE WORK: <br />PRE -SELECTED BY THE OWNER. <br />DO NOT BEGIN CONCRETE WORK UNTIL ALL LOADING CONDITIONS HAVE BEEN <br />VERIFIED BY GENERAL CONTRACTOR. <br />NOTE: VERIFY GIRDER OR POINT LOADS WITH <br />TRUSS/JOIST SUPPLIER THAT ARE ASSOCIATED <br />ALL CONCRETE WORK SHALL COMPLY WITH STATE AND LOCAL BUILDING <br />WITH STRUCTURE NOT INDICATED ON PLANS AND <br />CODES AND ORDINANCES. CONCRETE CONTRACTOR SHALL VERIFY ALL <br />CANNOT BE SUPPORTED ON TYPICAL SPREAD <br />REQUIREMENTS. <br />FOOTING. NOTIFY FOOTING & FOUNDATION <br />SUPPLIER PRIOR TO PROCEEDING WITH ANY <br />TYPICAL FULL HEIGHT FOUNDATION WALLS SHALL BE 8" MINIMUM CONCRETE <br />WORK, <br />REINFORCED WITH #4'S AT 24" O.C. EACH WAY AT 3/4" CLEAR OF INSIDE FACE. <br />WALLS 10" OR THICKER SHALL HAVE AN ADDITIONAL LAYER OF #4'S AT 12" O.C. <br />EACH WAY AT 3" CLEAR FROM EXTERIOR FACE. PROVIDE DOWELS TO FOOTING <br />TO MATCH MAIN VERTICAL WALL REINFORCEMENT, AND HOOK 12" INTO <br />FOOTING AT 3" CLEAR OF BOTTOM. <br />ROOF PLAN NOTES: <br />- TYPICAL ROOFING SYSTEM SHALL BE AS FOLLOWS: ASPHALT ROOF SHINGLES, <br />ROOFING FELT/SELF ADHERED ROOFING UNDERLAYMENT OVER ROOF <br />SHEATHING. <br />- STANDING SEAM METAL ROOF SYSTEM SHALL BE AS FOLLOWS: PREFORMED <br />STANDING SEAM METAL PANELS, RED ROSIN PAPER, ROOFING FELT/SELF <br />ADHERED ROOFING UNDERLAYMENT OVER ROOF SHEATHING. <br />- METAL PANS WHERE INDICATED SHALL BE FLAT SOLDERED SEAMED COPPER <br />OVER W.R GRACE "ULTRA" SELF ADHERED ROOFING UNDERLAYMENT. IF FIELD <br />SEAMING IS PERFORMED PLACE 2 LAYERS ROOFING FELT UNDER SEAM <br />LOCATIONS TO PROTECT UNDERLAYMENT. <br />- ROOFING FELT SHALL BE UL RATED 30 LB ASPHALT SATURATED ORGANIC <br />FELT. <br />-TYPICAL SELF ADHERED ROOFING UNDERLAYMENT SHALL BE W.R. GRACE <br />"ICE AND WATER SHIELD." INSTALL AT FOLLOWING LOCATIONS; 1) ALONG <br />EAVES EXTENDING A MINIMUM OF 36" HORIZONTALLY UP ROOF BEYOND THE <br />INSULATED WALL LINE, 2) 36" SHEET WIDTH ALONG GABLE (RAKE) ENDS, 3) <br />36" SHEET WIDTH AT VALLEYS, 4) 36" SHEET WIDTH AT ROOF/WALL <br />INTERSECTIONS, 5) ALL AROUND CHIMNES, SKYLIGHTS, AND OTHER ROOF <br />PENETRATIONS, 6) COMPLETELY AT ALL ROOFS LESS THAN 4:12 PITCH, 7) 26: <br />SHEET AT ROOF PITCH TRANSITIONS, 8) OTHER AREAS AS REQUIRED BY CODE <br />- INSTALL PREFINISHED METAL DRIP FLASHING ALONG ALL EAVES AND RAKE <br />ENDS TO HAVE MINIMUM 6" FLANGE ONTO ROOF SURFACE. <br />- INSTALL PREFINISHED METAL VALLEY FLASHING WITH 1" V -CRIMP, <br />12" MINIMUM UP EACH SIDE OF VALLEYS OR WEAVE SHINGLES AT VALLEYS. <br />INSTALL PREFINISHED METAL FLASHING AT ROOF PITCH TRANSITIONS <br />- INSTALL PREFINISHED METAL FLASHING ALONG ROOF/WALL INTERSECTIONS <br />AND ALONG ROOF/CHIMNEY INTERSECTIONS. <br />- CONFORM WITH "SMACNA" ARCHITECTURAL SHEET METAL MANUAL, LATEST <br />EDITION FOR ALL METAL ROOFING, FLASHING, AND ROOF PENETRATION <br />SYSTEMS. <br />- RIDGE VENTS TO BE HIGH PROFILE, PLASTIC TYPE, SHINGLE OVER VENT <br />SYSTEM (COR -A -VENT V-600 SERIES OR EQUAL). INSTALL CONTINUOUSLY <br />ALONG RIDGES. <br />- INSTALL ROOF TO WALL VENTS (COR -A -VENT ROOF -2 -WALL VENT OR EQUAL) <br />WHERE INDICATED ON DRAWINGS. <br />- NOT ALL ROOF PENETRATIONS ARE INDICATED ON THESE DRAWINGS. <br />COORDINATE FLUES, DRYER VENTS, PLUMBING STACKS, ETC. AND PROVIDE <br />ACCESSORIES AND INSTALLATION AS REQUIRED. ALL PENETRATIONS SHOULD <br />BE PLACED ON REAR SIDE OF ROOF IF POSSIBLE. REVIEW ALL PENETRATION <br />LOCATIONS IN FIELD WITH OWNER. <br />IMPORTANT NOTE FOR CONTRACTORS AND <br />SUBCONTRACTORS: <br />1. THESE DRAWINGS ARE DESIGN DRAWINGS. THE GENERAL CONTRACTOR <br />HAS THE RIGHT AND RESPONSIBILITY TO REVISE CONFIGURATIONS AND <br />DETAILS DEPICTED IN THE ARCHITECT'S DESIGN DRAWINGS, AS REQUIRED, <br />TO PROPERLY CONSTRUCT A TECHNICALLY SOUND PROJECT. <br />2. THE GENERAL CONTRACTOR IS TO NOTIFY THE ARCHITECT WHEN DEVIATING <br />FROM THE DESIGN INTENT. <br />3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL <br />COVENANTS, ZONING, BUILDING, FIRE, HEATING, PLUMBING, AND <br />ELECTRICAL CODE REQUIREMENTS. <br />*PROVIDE SELF SEALING <br />ASPHALT MEMBRANE (ICE <br />SHIELD) AT ALL VALLEYS SELF SEALING <br />ASPHALT MEMBRANE <br />\ (ICE SHIELD) -FIRST <br />(2)ROWS <br />15 LB. ASPHALT <br />ROOFING FELT <br />ASPHALT SHINGLES <br />AS SPECIFIED <br />9" SHINGLE STARTER <br />PREFINISHED METAL <br />EDGE <br />DETAIL AT TYPICAL ROOF EDGE <br />1 /2II _ v_0lI <br />© 2023 Windmills, Dssign Studio. <br />Rep,od"dion solely by Windmillo, Design Studio. <br />952.250.1941 <br />W INDMILLERDESIGNSTUDIO.COM <br />Lu �10 <br />Ln <br />^ co <br />VLn <br />Ln <br />\ Z <br />1� <br />\ O <br />C= <br />0 <br />'^) <br />V O <br />Y N <br />i <br />I..L V) <br />4J <br />J <br />Ln <br />U Ln <br />NM <br />ERRORS OS OMISSIONS, <br />RESIGN STUGIO, LLC, <br />ASSUMES NO RE-SIBILIiY FOR <br />rvS.— <br />H DIO Sw ErvEREMUST <br />o GRED ALLNOTEs. <br />EAI LS,AryELEVATIONS, SECTIONS <br />All <br />seROCONR nory_OR TO <br />THE START OF CON- <br />I. <br />ISSUE DATE <br />FARWRAWA <br />BUILDING <br />DETAILS <br />