My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7373
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 7300 - 7399 (October 10, 2022 - September 11, 2023
>
Resolution 7373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2024 3:35:13 PM
Creation date
6/14/2023 2:30:00 PM
Metadata
Fields
Template:
x Address Old
House Number
1015
Street Name
Wildhurst Trail
Address
1015 Wildhurst Trail
Document Type
Prelim Plat Resolution
Permit Number
LA23-000011
PIN
0711723210002
0711723210017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1..0AT CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> �l C� NO. 7373 <br /> -4KESH0T- <br /> iv. Over all pipes, swales, and ditches providing a drainage path for multiple <br /> properties. <br /> b. A Drainage Easement shall be granted over all wetlands, creeks, and buffers on the <br /> Property. <br /> c. Driveway Easement and Maintenance Agreements. <br /> B10. Upon evidence of resettlement history, the Developer shall cease all activity and contact the <br /> City and the State Historical Preservation Office prior to proceeding. <br /> B11. Development Fees are based on the 2023 Fee Schedule: <br /> a. Stormwater and Drainage Trunk Fee: $8,060.00 per lot in a 2-acre zone. SWDT Fee due <br /> $8,060 x 2 lots = $16,120.00. <br /> b. Park Dedication Fee: [$7,925.73 x 1 new lot] = $7,925.73. <br /> B12. Plans and Specifications. The following plans and specifications shall be submitted for review <br /> and approval by the City and other appropriate jurisdictions prior to final plat approval, to ensure <br /> that the proposed plat will accomplish the intended purposes: <br /> a. Final grading, drainage and erosion control plan showing existing and proposed contours, <br /> anticipated building locations, elevations, stormwater facilities and calculations, utilities <br /> and erosion control measures to be used during construction. Final Plat Approval will not <br /> be granted until the MCWD has approved the stormwater management plans. <br /> b. Final sanitary sewer plans. <br /> c. Final stormwater management plan, if applicable. <br /> d. Final stormwater pollution prevention plan (SWPPP), if applicable. <br /> e. Final plans for installation of the development identification monument sign, if applicable. <br /> A separate Sign Permit is required prior to installation. <br /> f. Sufficient detail to meet the recommendations of the City Engineer. <br /> B13. Developer shall execute a Developer's Agreement for construction of improvements on the <br /> Property to ensure all site improvements are installed to the City's specifications and satisfaction. <br /> Said Developer's Agreement may contain additional conditions not noted in this Preliminary Plat <br /> Approval resolution. <br /> a. No land alterations can take place until erosion control is established and the City is in <br /> receipt of a final grading. <br /> b. No improvements can begin until the City Engineer has approved all improvement plans. <br /> c. No improvements can begin until 24 hours after the Plat has been recorded with <br /> Hennepin County. <br /> d. A Letter of Credit must accompany a fully executed Developer's Agreement written to <br /> 150% of the cost of the proposed site improvements. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.