Laserfiche WebLink
Estimate <br />Date <br />5/15/2023 <br />Estimate # <br />13352 <br />Name / Address <br />CITY OF ORONO <br />2750 KELLEY PARKWAY <br />ORONO, MN 55356 <br />4211 Steiner Street, Suite B <br />St. Bonifacius, MN 55375 <br />Rep Project <br />Phone # <br />(952) 955-5075 <br />Fax # <br />(952) 955-5026 <br />E-mail <br />mail@securityandsoundco.com <br />Web Site <br />www.securityandsoundco.com <br />Total <br />Subtotal <br />Sales Tax (0.0%) <br />Description Qty Cost Total <br />BiAMP 4 CHANNEL POE CONF AMPLIFIER - voicelift 2 749.00 1,498.00 <br />MID ATL - 1U RAQCK SHELF 2 54.00 108.00 <br />FURMAN 8 PORT POWER CONDITIONER - rack mnt 1 134.00 134.00 <br />COMPLETE SYSTEM INSTALLATION <br />- wiring, equip install, termination and testing <br />1 6,950.00 6,950.00 <br />SET-UP AND COMMISSIONING <br />- system programming <br />- based upon (4 hours max, other than the original install) <br />- 4 hrs total / interface with the video conferencing <br />1 2,750.00 2,750.00 <br />EQUIPMENT FLOW CHART / DRAWINGS 1 370.00 370.00 <br />MID ATLANTIC ETHERNET PANEL - w/NEUTRIK 1 75.00 75.00 <br />ESTIMATED FREIGHT 1 440.00 440.00 <br />Page 3