Laserfiche WebLink
<br />H:\ORNO\0C1128384\1_Corres\C_To Others\2023-05-15 Bid Award Recommendation.docx <br /> <br />May 15, 2023 <br /> <br /> <br /> <br />City of Orono <br />Attn: Adam Edwards <br />2750 Kelly Pkwy <br />PO Box 66 <br />Orono, MN 55356 <br /> <br /> <br />RE: Bid Results for the 2023 Parking Lot Improvements Project <br /> <br /> <br />Dear Mr. Edwards: <br /> <br />Enclosed is the bid abstract for the 2023 Parking Lot Improvements project. The project was bid in two <br />parts. Part A is the Navarre parking lot and Part B is the golf course parking lot. GMH Asphalt was the <br />low bidder for both parts. Six bids were received and are listed below: <br /> <br />Contractor Part A Part B Bid <br />GMH Asphalt $242,959.50 $42,149.15 $285,108.65 <br />Bituminous Roadways $251,529.00 $45,625.80 $297,154.80 <br />Park Construction $262,309.60 $47,419.10 $309,728.70 <br />Minnesota Roadways $269,112.10 $50,435.60 $319,547.70 <br />Valley Paving $271,948.00 $51,024.00 $322,972.00 <br />Asphalt Surface Technologies $286,430.30 $52,902.80 $339,333.10 <br /> <br />Please let me know if you have questions or need additional information. <br /> <br />Sincerely, <br />Bolton & Menk, Inc. <br /> <br />David P. Martini, P.E. <br /> <br />