My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-2023 Compliance Inspection Report
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
280 Wakefield Road - 36-118-23-31-0013
>
Septic
>
05-23-2023 Compliance Inspection Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:25 PM
Creation date
5/25/2023 11:47:42 AM
Metadata
Fields
Template:
x Address Old
House Number
280
Street Name
Wakefield
Street Type
Road
Address
280 Wakefield Road
Document Type
Septic
PIN
3611823310013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Impact on public health — Compliance component #1 of 5 <br />Compliance criteria: Attached supporting documentation: <br />System discharges sewage to the 17 Yes E-] No —j Other. <br />ground SUI-faCe <br />Not applicable <br />System discharges sewage to drain l_-'] Yes L-, -j No <br />the or sur -face waters. <br />System causes sewage backup into Yes No <br />dwelling or establishment. <br />Describe verification methods and results: <br />Visual <br />2. Tank integrity — Compliance component #2 of 5 <br />Compliance criteria: <br />System consists of F seepage pit. El' Yes 71 No <br />cesspool. drywell. leaching pit, <br />or other pit? <br />Sewage tank(s) leak below their El Yes E] No <br />designed operating depth? <br />If yes. which sewage tank(s) leaks, <br />Attached supporting documentation: <br />7 Pumped at time of inspection <br />Sewer Services <br />Name of maintenance business: Inc- <br />License <br />ncLicense number of maintenance business: 2502 <br />Dale of maintenance. 05/23/2023 <br />Existing tank integrity assessment (Attach) <br />(Date of r-nainteria rice <br />IVIM-r/dd;yyyyi (must be within three years) <br />(See foi7,n Instroctions to ensure assessment complies with <br />Miert R, 7082.0700 subp, 4 B (1)) <br />1 ank is Noncompliant ;pumping not necessary -- explain below] <br />rL-1' Other <br />Describe verification methods and results: <br />Tanks were pumped out at the time of inspection Carne, a inspection on the first two tanks are showing dertenoration of the <br />concrete baffles and both tanks will need to be replaced in the future At this time it does not consider the tanks to be non- <br />complient PLIMP tanks every 3 years <br />'1'ttPS://v,,:,,,,-,.D('! stalu,mw,—, 651-296-6`103 ycl:! Dri,fawed rciay service <br />Avadab e 'r' WLCI native fo, mats <br />Po, 9 r, 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.