Laserfiche WebLink
, �� _..._ ,_. <br /> ♦ Estend south wall in budery so that it is straight(creating a void behind). Use 5/8 inch drywall <br /> and finish with 3 coats of mud and make paint-ready. <br /> ♦ Supply and install new (brand and stock numbers to be provided later this week) door casings <br /> (�4.5";additional moulding on door crown),window casings (�3.5'�,and baseboards (�7'� in <br /> family room,kitchen,and budery. Install moulding on ceiling above island (oudining island- <br /> sryle and more details to be provided later this week). <br /> F1oor <br /> ♦ Note: we assume all flooring work will be completed in accordance with code. <br /> ♦ Note: we assume all cabinetry (island,budery,hutch,range wall,desk, tv/wet bar) will be <br /> installed on sub-floor. (Please tile below the knee space under desk.) <br /> ♦ Supply and install sub-floor suitable for stone tiling throughout family room, kitchen,and <br /> budery. Provide details on what eYacdy will be done and where we should expect changes in <br /> floor levels. Specify elevation changes that might pose problems with door Cunction,etc. <br /> ♦ Supply and install in-floor wamung system in family room and kitchen (not budery). Infloor <br /> heating should not go under any cabinets except below knee space under desk. Please provide <br /> estimates for both hydronic and low-profile electric systems and provide detailed specs for <br /> equipment with estimates. <br /> ♦ Supply and install Walker Zanger Pavio Antiqua-Walnut stone tiles throughout family room, <br /> kitchen and budery. Available from RBC Tile&Stone,but if other distributors supply them for <br /> less,any source is fine(although we would like to approve samples before final order is placed.) <br /> Four sizes (8s8, 8s16, 16x16,& 16x24) —pattem attached. Fill holes in stone surface while <br /> gcouting tiles in place. Grout color to be specified. <br /> ♦ Seal stone with Rubble Tile's 511 petroleum based sealer. <br /> Plmin <br /> � 1�'ote: we assume all plumbing work will be completed in accordance with code. <br /> � Properly seal off/remove all plumbing leading to former kitchen sink. <br /> ♦ Install plumbing to for two sinks on island (prep sink and main clean-up sink) and sink in <br /> budery. <br /> ♦ Install plumbing for dishwasher in kitchen and dishwasher in budery. <br /> ♦ Install plumbing for icemaker in family room next to wet bar. <br /> � ♦ Supply and install Kohler K-3332 undermount stainless steel sink and Brasstech Newport Brass <br /> 943 (with spray) in anaque pewter faucet on south side of island. <br /> • Supply and install Kol�ler K-3330 undermount stainless steel sink and Brasstech Newport Brass <br /> 942 (without spray) in antique pewter faucet on west side of island. <br /> ♦ Supply and install (Brand and Model #s to be provided later this week) <br /> undermount sink and Brasstech Newport Brass 928 in antique pewter faucet in budery <br /> ♦ Supply and install (Brand and I�Iodel #s to be provided later this week) sink <br /> and Brasstech Newport Brass 928 in antique pewter faucet in wet bar in Family room. <br /> �♦ Supply and install two disposals in island sinks (Brand and�1ode1 #s to be provided later this <br /> week). <br /> ' ♦ Supply and install one hot water dispenser nest to sink on south side of island (Brand and Model <br /> #s to be provided later this week). <br /> � ♦ Supply and install one under-counter drinl;ing water filtration system with dispensing tap nest to <br /> sink on west side of island (Brand and Model #s to be provided later rhis week). <br /> � ♦ Supply and install gas line to rangetop in kitchen and dryer in laundry room. <br /> � ♦ Supply and install equipment to provide an outside vent for hood. <br />