Laserfiche WebLink
/ <br /> ,�� <br /> %� °����� <br /> ,;o o ,,,, <br /> �� . - ��� c�TY o� o�o�a <br /> �, ,� y '��� <br /> , , �, ,� '-' � ,'; Municipal Offices <br /> ` � , `i � `��, '� G % Street Address: Mailing Address: <br /> '�'� � � � � '� ;� P.O. Box 66 <br /> `��� 9 ES� 'S�� , 2750 Kelley Parkway <br /> �: , �C O ; <br /> �������� Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address �Q �C� � �o 1.�.� � � _ <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes _�� <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> . The tanlc(s) should be cleaned through the manhole and <br /> not throu�h the inspection pipes, tlus allows for proper cleaning. <br /> Comments: <br /> � <br /> Inspec�i�:�GJ���-"� �4�!.�i�'� Date of Inspection —� �� "�� <br /> Telephone(952)249-4600 • Fax (9�2)249-4616 <br /> www.ci.orono.mn.us <br />