My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-2023 Planning Commission Packet
Orono
>
Planning Commission
>
2023
>
05-15-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2023 8:34:35 AM
Creation date
5/12/2023 3:58:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
5/12/2023 4:05 PM
Modified:
5/12/2023 4:05 PM
Text:
PC Exhibit E
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3"Concrete 5lab <br />on4"gravel bed _ <br />Existing 2x0 ' <br />KITCHEN <br />JOISTS <br />New Ledger (200) <br />4a4Stair Posts <br />Sliding Door <br />Gontinouil Stair <br />/ <br />- - Kitchen Door <br />Existing Spigot <br />an 14" Concrete <br />Rail <br />Window <br />_ <br />3"Concrete 5lab <br />on 4"G avelBed <br />DININGROOM <br />Existing Le4ger(2x10) <br />Existing <br />Window i Exiing2xlo <br />DblHeader <br />Joinstt Hangers <br />Extended Ledger 6x6poet <br />- <br />Electrical s <br />+ <br />{OverlappedlpoubledOF- 2) <br />\ <br />Dbl.JoiSto Fixture <br />Continuous <br />el <br />Stair <br />Chimney <br />h N <br />it <br />{ <br />I <br />DbLJoietHangers <br />Angle.`t <br />I <br />Bracket <br />� <br />14"Cont. to <br />Footing <br />6x6 Posts _` <br />i5 - <br />4x4 5tair Posts <br />-- <br />on 14° Concrete Footing <br />14"ConcreTe <br />Angled 2x70 <br />g <br />18" Concrete Footing <br />' <br />Footing <br />Joint <br />` <br />JOISTS: 200 Pressure -Treated (P.T.), 5outhern Pine (5P) 16" on center <br />Hangers <br />! <br />6x6 Posts <br />BEAM5: 200 (2) P,T. 5P <br />Attached to Posts with Galvanized 6x6 Post Gaps <br />1 I <br />i <br />POSTS: 6x6 P.T. 5P <br />Attached to footing wlGa Iva nixed 6x6 Post Anchor <br />RAILING POSTS: 4x4 PT SP - 6k Apart <br />Simpson Angled <br />- <br />DECKING: 1"x 5.5" composite, run lengthwise <br />POST FOOTING: 14" x 44" Concrete <br />4xa ilingPost <br />(,'Apart <br />5TAIRFOOTING:14"x 44 Concrete <br />14"Concrete Footing <br />3020 Casco Point Road <br />RAILING: Gable Railing wl3" spacing <br />Deck Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.