My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-2023 Planning Commission Packet
Orono
>
Planning Commission
>
2023
>
05-15-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2023 8:34:35 AM
Creation date
5/12/2023 3:58:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
5/12/2023 4:01 PM
Modified:
5/12/2023 4:01 PM
Text:
PC Exhibit F
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QBOLTON <br />& MENK <br />Real People. Real Solutions. <br />May 4, 2023 <br />City of Orono <br />Attn: Melanie Curtis <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />RE: Preliminary Plat Application <br />Wildhurst Trail <br />Engineering Review #1 <br />Dear Melanie: <br />2638 Shadow Lane <br />Suite 200 <br />Chaska, MN 55318-1172 <br />Ph: (952) 448-8838 <br />Fax: (952) 448-8805 <br />Bolton-Menk.com <br />As requested, I have completed an engineering review of the documents submitted for the above - <br />referenced project. I offer the following comments for your consideration: <br />1. Connection of the driveway serving the two new lots will need to be reviewed in relation to the <br />existing driveway for 1003 Wildhurst Trail. <br />2. Connection to the municipal sanitary sewer system is available from Wildhurst Trail. These lots <br />should be required to connect to this system, in lieu of using on-site septic systems. A manhole <br />installed for 1003 Wildhurst Trail may facilitate a short distance to connect to the system. <br />3. Wildhurst Trail was improved in 2018. Connection of the new driveway will need to be <br />coordinated with the current drainage layout. <br />4. Drainage and Utility Easements must be provided as follows: <br />a. Over all sanitary main serving multiple lots. <br />b. Over all wetlands, creeks, and buffers. <br />c. Over all pipes, swales, and ditches providing a drainage path for multiple properties. <br />d. 5' along all side lot lines, unless adjacent to Development boundary. <br />e. 10' along all front lot lines, rear lot lines, and adjacent to Development boundary. <br />If you have any questions or comments, please contact me to discuss. <br />Sincerely, <br />Bolton & Menk, Inc. <br />j�zc-�4g "4 <br />Robert E. Bean, Jr., P.E. <br />Water Resources Engineer <br />CC: Adam Edwards, Director of Public Works / City Engineer <br />H:\0RN0\_Surface Water Management\MS4 Administration\MCM-5\2_Site Plan Reviews\2023\Wildhurst Trail\WildhurstTrail_PP Review_2023-05-04.docx <br />Bolton & Menk is an <br />
The URL can be used to link to this page
Your browser does not support the video tag.