My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-24-2023 Council Packet
Orono
>
City Council
>
2023
>
04-24-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2023 11:58:42 AM
Creation date
5/9/2023 11:58:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
291864 OR-City Hall 2750 Kelley Pkwy to Public Works - New Build 2023 <br /> <br />Installation of fiber optic network to connect City Hall to Public works. This will be a joint build project <br />with Arvig doing the OSP construction and LOGIS providing materials (no switch) and splicing. <br />Materials $14,832.00 <br />Labor $52,620.44 <br />Total $67,452.44 <br /> <br />Estimated annual locates $0.00 Covered by Arvig
The URL can be used to link to this page
Your browser does not support the video tag.