My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7365 (2)
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 7300 - 7399 (October 10, 2022 - September 11, 2023
>
Resolution 7365 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:18:25 PM
Creation date
5/9/2023 10:50:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3017
Street Name
North Shore Drive
Address
3017 North Shore Drive
Document Type
Preliminary Plat Resolution
Permit Number
LA23-000015
PIN
0911723320002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> No.7365 <br /> lkisN00" <br /> 2) Driveway Access. Driveway access to Lots 1 and 2 shall be a shared driveway within Lot 1. <br /> All other curb cuts or access points onto the adjacent County Road shall be removed. The <br /> Developer shall establish the appropriate shared driveway easements and maintenance <br /> covenants over the shared driveway area identified on Exhibit A. <br /> 3) Trail Easement. An easement for public trail purposes concurrent with required 10-foot <br /> perimeter drainage and utility easement shall be granted by the Developer over the <br /> northwesterly 10 feet of the plat parallel with North Shore Drive. <br /> 4) Municipal Sewer and Private Well. The Property is located within the Metropolitan Urban <br /> Service Area (MUSA). City sewer service is available to the properties. Both Lots 1 and 2 <br /> shall make individual connections to the existing sewer main in North Shore Drive. The <br /> properties will be served by individual private water supply wells. <br /> 5) City Utility Connection Charges. The Property was fully assessed for sanitary sewer as a <br /> single parcel for one unit. . A second sewer connection charge will be due for Lot 2 prior to <br /> Final Plat approval in the amount of$5800.00 (2023 Fee Schedule). <br /> 6) Metropolitan Council Sewer Availability Charge(SAC). Met Council SAC charges for the <br /> newly created lot will be due at the time of building permit for Lot 2. <br /> 7) Stormwater and Drainage Improvements. Final plat approval is subject to Minnehaha <br /> Creek Watershed District(MCWD)approval and permits as required.Final plat approval shall <br /> not be granted until the Developer has provided evidence that all required MCWD permits <br /> have been obtained. Upon building permit issuance, the property owner will be required to <br /> comply with individual lot stormwater and erosion control management practices. <br /> 8) Drainage and Utility Easements. On the final plat, Drainage and Utility Easements shall be <br /> dedicated to the public 10'along all exterior property lines,and 5'either side of interior property <br /> lines, except such easements shall be increased to accommodate drainage where required, <br /> subject to City staff approval. If applicable, Drainage Easements shall be granted over any <br /> stormwater facilities required by the Minnehaha Creek Watershed District; the Drainage <br /> Easements shall be shown on the Plat. <br /> 9) Removals. A demolition permit must be issued and final for the encroaching improvement on <br /> the existing parcel prior to submittal of final plat application. This includes a portion of the <br /> garage,patio, utility and landscaping improvements, identified within Exhibit A <br /> 10) Development Fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.