My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-08-31 Septic System Soil Report
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4680 Bayside Road - 31-118-23-33-0014
>
Septic
>
1994-08-31 Septic System Soil Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:03 PM
Creation date
5/9/2023 10:44:04 AM
Metadata
Fields
Template:
x Address Old
House Number
4680
Street Name
Bayside
Street Type
Road
Address
4680 Bayside Road
Document Type
Septic
PIN
3111823330014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Determine pump capacity: <br />Gravity Distribution <br />I. Minimum suggested is 600 gallons per hour (10 gpm) to stay ahead of <br />water use rate. <br />2. Maximum suggested for delivery to a drop box tlf a horne system is 2,7{1(1 <br />gallons per hour (45 gpm) to prevent build-up of pressure in drop box. <br />Pressure Distribution <br />3. a. Select number of perforated laterals <br />b. Select perforation spacing - *S ft. <br />c. Subtract 2 ft. from the rock laver length. <br />cL Determine the number of spaces between perforations. <br />Length perf. spacing = AL fi. + 3 It. spaces <br />e. _Z42- spaces + 1 = 17 perforations/lateral <br />L Multiply perforations per lateral by number (if laterals to <br />t total nunnber of perforations. <br />X -L- _ prrforations- <br />tiwT. �.,00 ,l <br />g. .Z -/x • _am� ' gpm. <br />SELECTED PUMI' CAPACITY -51 gpm <br />B. Determine head requirements: <br />1. Elevation difference between pump and point of discharge. <br />d feet <br />2. If pumping to a pressure distribution system,add five feet for pressure <br />required at manifold <br />S feet <br />3. Friction loss <br />a. Enter friction loss table with Fpm and pqv diameter. <br />Read friction loss in feet per IW fLvt from wFdr. <br />F.L. = Z•Ok ft./100 ft of pipe <br />b. Determine total pipe length from pump to discharge <br />point. Add 25 percent to pipe length for fllttng <br />loss, or use a fitting loss chart. Equtvolrnt pipe <br />'cngth ' 25 times pipe length = <br />o _ x 1.'_'5 = S't, feet <br />c. Calculate total friction loss b; multiplying <br />friction loss in It/ 100 ft by equivalent pipe IcnFth. <br />Total friction loss - �St7 x _2t__i?-+IW = / -. feet <br />4. Total head required is the sum of elevati(m Litffcrcncc, <br />special head requirements, and total friction loses. <br />111 42) (3c1 <br />TOTAL NEAT) 1 feet <br />C. Pump selection <br />I. A pump must be selected to deliver at least zz gpin (Step A) <br />with at )east feet of total head (Step li). <br />E110 PrprORATION OF ► P[rMOn►T[D L►T[R►L <br />/- <br />C. w Co- <br />iNM.I r� <br />l.ro .I G.L..r.. POW a IV 1.. <br />q <br />L.nSW Loiw w► wiles M �.! r Lew �.w.N <br />.••. V saw <br />P., W..+• Chow*ft coo POW ft# <br />ISM VMq.r <br />64�!w fri�11� �.,L .1 Nes. L.t., <br />P.-I.G.- UK." .1 <br />two. SW Lapp Mow...1 L.." <br />..1 W <br />oayr.l UN ....+ry S &Jr 4 <br />DOW. 11w..y Sow. L,..w <br />TAOIT or f [RroRAT1oN VISCI IARCr51N CIV <br />1fe.id I'crfuratiundla"tat0rcMsl - <br />I0 <br />0.69 <br />1,0A <br />O.S6 074 <br />15 <br />069 040 <br />2 Ob <br />060 1 W <br />25 <br />034 117 <br />30 <br />046 1.23 <br />40 <br />1.13 1.47 <br />so <br />1.26 165 <br />aUv 1.0 <br />bUse 2 <br />foot of head for rrudernttal sy-men-S <br />0 feet of head for other establishments <br />Plpc Lcrph <br />Point or TDischarrc <br />Elevatilm Diffcrertccl <br />1'untp <br />F 18b <br />1.S Inch 2 o I h 3.01r,.h <br />pen rr a w ► tm h or p.,w <br />I0 <br />0.69 <br />0.20 <br />12 <br />0.46 <br />0.28 <br />14 <br />1.28 <br />0.38 <br />16 <br />1.63 <br />0.48 <br />IS <br />2,03 <br />0.60 <br />20 <br />2.47 <br />0.73 <br />0.11 <br />25 <br />3.73 <br />1.11 <br />0.16 <br />AIL <br />15 23 <br />1.55 <br />0.23 <br />S0 <br />790 <br />2.06 <br />0.30 <br />11.07 <br />: 64 <br />0.34 <br />45 <br />14.73 <br />3.28 <br />1 049 1 <br />50 <br />3.99 <br />G.36 , <br />55 <br />4.76 <br />071 <br />60 <br />S 60 <br />0 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.