My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-08-31 Septic System Soil Report
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4680 Bayside Road - 31-118-23-33-0014
>
Septic
>
1994-08-31 Septic System Soil Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:03 PM
Creation date
5/9/2023 10:44:04 AM
Metadata
Fields
Template:
x Address Old
House Number
4680
Street Name
Bayside
Street Type
Road
Address
4680 Bayside Road
Document Type
Septic
PIN
3111823330014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUND DESIGN WORKSHEET <br />(For Flows up to 1200 gpd) <br />A. FLOW <br />Estimated gpd (see pages D-% or 1-3,4,5) <br />or measured gpd. <br />B. SEPTIC TANK LIQUID VOLUMES <br />-2 opo gallons (see Pages C-3 or C-5) <br />C. SOILS (refer to site aluation) <br />1. Depth to restricting layer = /•Z inches <br />2. Depth of percolation tests = /Z inches <br />3. Percolation rate 44- mpi <br />4. Land slope 4 170 <br />D. ROCK LAYER DIMENSIONS <br />1. Multiply flow rate by 0.83 to obtain required area of rock <br />layer: A x 0.83 = <br />4:�,cv2 gpd x 0.83 sq. ft./gpd =- sq. ft. <br />2. Select width of rock layer (10 feet or less) _ /o ft. <br />3. Length of rock layer = area + width = <br />Soo sq. ft. + ZC7 - ft = 422 ft. <br />E. ROCK VOLUME <br />1. Multiply rock area by rock depth to get cubic feet of rock; <br />Sba sq. ft. x / ft. -,�co cu. ft. <br />2. Divide cu. ft. by 27 cu. ft./cu. yd. to get cubic yards; <br />-9,v cu. ft. + 27 = &&; cu. yd. <br />3. Mu:tiply cubic yards by 1.4 to get weight of rock in tons; <br />i��cu. yd. x 1.4 ton/cu. vd. _ :�, tons. <br />F. ADSORPTION WIDTH <br />1. Percolation rate in top 12 inches of soil is 14 mpi <br />2. Select allowable soil loading rate from table on page E-16; <br />-�� gpd / f 0) <br />3 Calcu:ate adsorption width ratio by dividing rock layer <br />loading rate of 1.20 gpd/ft2 by allowable soil loading rate; <br />1.20 gpd/ft2+ ,sem gpd/ft2 = 2 , 4 c' <br />Check this value on page E-16. <br />4. Multiply adsorption width ratio by rock layer width to get <br />required adsorption width; <br />/x2.dvft= Z4'ft <br />G-19 <br />D-7 <br />C-3 <br />tT•r.0 .t�11R rd.. _ tl..M Ir 71• <br />34.nC t.uM CAP&WKS, M 6410.5 <br />mom <br />1..ur 111 <br />11,1 <br />1— IN/ <br />1111 <br />1— 1111 <br />r <br />•n er �' <br />IN. <br />`s <br />C-3 <br />34.nC t.uM CAP&WKS, M 6410.5 <br />mom <br />1..ur 111 <br />11,1 <br />1— IN/ <br />1111 <br />1— 1111 <br />1.11 <br />• . � / NN <br />IN. <br />Rock Bed <br />...... ... ... . <br />E-16 i <br />�•wr. V.� YM _ r. r..V �1 <br />------------ <br />♦. .._ <br />11. .M •- _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.