My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1979-11-20 Letter, Fire Damage Cleanup
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
4680 Bayside Road - 31-118-23-33-0014
>
Correspondence
>
1979-11-20 Letter, Fire Damage Cleanup
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:01 PM
Creation date
5/9/2023 10:32:58 AM
Metadata
Fields
Template:
x Address Old
House Number
4680
Street Name
Bayside
Street Type
Road
Address
4680 Bayside Road
Document Type
Correspondence
PIN
3111823330014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00 <br />November 20, 1979 <br />Telephone 473-7357 <br />CITYof ORONO <br />Post Office Ho= 66 *Crystal Hay, Minnesota SSW *Municipal Offices <br />On the North Shore of Lake Minnetonka <br />Ski Tonka Inc. <br />432 Midland Bank Building <br />401 Second Avenue South <br />Minneapolis, MN 55401 <br />RE: 4680 Bayside Road - Fire Damage Clean -Up <br />Gentlemen: <br />An inspection conducted at above subject property on November 19, 1979 <br />revealed violations of State Statute 463.251, Securing Vacant Building, <br />and City Ordinance 82.050(a), Public Nuisances - Building and <br />Structures - Fire Damage. To correct these violations as stated in <br />a letter dated October 2, 1979, the following items must be completed: <br />1) Board up doors and windows to prevent entry into structure. <br />2) Put barrier up to prevent entry to first floor from all <br />sides of structure and remove deck stairs (snow fence or <br />something equal). The best solution is to place fence on <br />foundation wall surrounding the entire first floor level <br />and deck. <br />3) Remove chimney by knocking it down. <br />These items were to be completed by October 9, 1979; Mr. Primus asked <br />for a 10 -day extention which was granted. This left the clean-up of <br />violations to be completed October 19, 1979. <br />I am now notifying you that if the violations are not corrected and <br />inspected within 10 days, a citation will be issued. <br />If you have any questions, please do not hesitate to call me. <br />Sincerely, <br />rt�1wM..j�`1'G1 <br />Thomas J. Jaco s, Building Inspector <br />TJJ:dj <br />cc: Alan Olson <br />Mel Kilbo <br />Fritz Brown <br />
The URL can be used to link to this page
Your browser does not support the video tag.