Laserfiche WebLink
E ; <br />)1RC01aT10N Tiff DATA 5SW M <br />Tont hole location gerl <br />lnls scrag 3 <br />Dau cost Role was Prepared <br />Mptb of holo bettes.1$ taeMr, <br />Diameter of holo. _� Inches, <br />foil data from test bole: <br />Depth. Inches <br />loll team* <br />b -/Z <br />�i //•,':• ter.... - <br />Method of rcratehint aidewall <br />:'aPth of pea -aimed travel in bottom <br />of hole, Z Iodise, <br />Date and hour of i.,itial water filling <br />5 -;IC) -:58 63:vp <br />:)sPth cf initial water filling, <br />J 5 inches abew hole bot tes. <br />Mcthod used to maintain at least 12 <br />inches of water depth is hole for at least <br />4 hours re �rll;n <br />Percolation test rsadingssad de by <br />t'66 <br />starting at `, : i m Maxlennam esdepthew ter <br />(date) —x'0.1. <br />abbole better <br />during test, / Q- inches. <br />mime <br />Siena i lntorval, 4easurerent, <br />� Percolation <br />Drop in water rau. Remarks <br />Kinutes I inches <br />level, inches minutes per <br />inch <br />Percolation tato a 20. 2- menton POT lsN. <br />