My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-03-02 Property Owner Letter, Construction Schedule
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
4050 Bayside Road - 06-117-23-11-0004
>
Correspondence
>
1985-03-02 Property Owner Letter, Construction Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:22:51 PM
Creation date
5/4/2023 4:02:16 PM
Metadata
Fields
Template:
x Address Old
House Number
4050
Street Name
Bayside
Street Type
Road
Address
4050 Bayside Rd
Document Type
Correspondence
PIN
0611723110004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR <br />Mr. Thomas Jacob <br />City Building Inspector <br />City of Orono <br />1335 S. Brown Road <br />Crystal Bay, MN 55323 <br />Dear Tpjm, <br />4054) Dayside Road <br />Maple Plain, MN 55359 <br />March 2, 1985 <br />This letter is in response to your request for such a letter <br />to formally receive permission for occupenc�- of our home while <br />completinq the construction project. We understand that this <br />situation is unique and we have designed this project so that we <br />will not adversely effect others while we are worl•. i ng on i t . We <br />R will follow our local buildinq codes and tho suggeslions you <br />might have to ensure a safe structure. <br />We have started the drywall installation in the basement <br />area and have the lumber ordered to frame the upper two floors. <br />Construction will begin March 4, 1985, weather permitting, and <br />the carpenter expects thc.- framing, roof, and window installation <br />to br completed by the end of April. <br />Our building site is secludod and not visible to our <br />neighbors, so that we will not detract from the esthetics or our <br />neighborhood during construction. If we do have objections from <br />our neighbors, we will worlc promptly to correct the situation <br />that caused the objection. <br />We have clear title on otir land and home and hope to keep it <br />that way. Our plans are to build a home we can stay in through <br />our retirement. 1 do not want to work against your system, and <br />will be glad to talk with you about any specifics on our future <br />plans, and/or, the reasons we have chosen this method for <br />building our home. We need your technical input and your <br />approval, so thot this building project will be a success. <br />Thank you for your time and consideration. <br />Si ncerel y, <br />Gary and Mary Connell <br />
The URL can be used to link to this page
Your browser does not support the video tag.