Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
•ane!:Control-1 Pump Control Panel <br /> This component was: Fully Inspected <br /> Panel functioning(including alarm): YES <br /> Pump 1:on minutes(override in parentheses-if present): 2.3 <br /> Pump 1:off hours(override in parentheses-if present): 4 <br /> Pump 1:gallons per dose(override in parentheses-if present): - <br /> Pump 1:ETM hours(override in parentheses-if present): 176.20 <br /> Pump 1:Cycle Count(override in parentheses-if present): 5891 <br /> grainfield(disposal):Pressure Mound-10'x 50'Rockbed <br /> This component was: Fully Inspected <br /> Lateral lines flushed: NO <br /> Average squirt height(if performed)(feet,if other specify): - <br /> Ponding present?If YES explain in comments: NO <br /> This report indicates certain characteristics of the onsite sewage system at the time of visit.In no way is this report a guarantee of operation or future performance. <br /> ReportiD:1116053 View inspection reports online at www.onlinerme,com Page 2 of 2 <br />