My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-01-1976 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1970-1979
>
1976
>
03-01-1976 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2023 2:48:08 PM
Creation date
4/19/2023 3:33:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LETTER, <br />MINUTES OF A PLANNING uOMMISSION MEETING HELD FEBRUARY 17, 1976 - PAGE 6. <br />have been accepted. No written reply was received to this <br />letter. <br />July 18, 1975. A ticket was issued. <br />January 23, 1976. Received a letter from you (Mr. Muhich), <br />idiich essentially said the following: <br />a. Grade the excavated area such that all of the water that <br />used to run to the swamp will again run to the swamp. <br />b. Plant a number of trees. <br />January 27, 1976. My attorney and I met with several Village <br />officials at the Wayzata Court House. <br />February 2, 1976. Received another letter from you (Mr. Muhich) <br />stating in more deteiil your restoration requirements. <br />I have read your February 2nd letter and agiee to its concept, <br />and agree to do the following: <br />a. Regrading. <br />1. There will be at least a 2% grade from the location <br />of the old berm which has been removed to the marsh <br />located to the east of the property line. <br />2. A berm will be constructed at the location of the old <br />berm, vhich was removed, which shall be high enough <br />to effectuate the 21 grade. <br />There shall be no excessive cutting or filling on the <br />property except as necessary to effectuate the terms <br />of this letter and there shall be no additional cutting <br />and filling except for that shown on the plan attached <br />hereto. <br />I will prior to any excavation or filling on the pro <br />perty, place hay bales along the lake near the location <br />of the berm which was previously removed and along tlie <br />marsh to prevent sedimentation run-off into the lake <br />and marsh during the disturbance of the earth. These <br />bales whall not be removed until completion of the earth <br />excavation and filling and after the sodding of the en <br />tire area. <br />All cutting, filling and grading is to be completed with <br />in a 72-hour time period and I will give Hank ^^uhich 24 <br />hour notice prior to the commencement of construction <br />and shall notify Hank Muhich of its completion. <br />6. All areas of my property disturbed by the filling, ex <br />cavating or grading will be sodded witliin four hours of <br />the completion of said filling, excavation or grading. <br />7. Any swale or otlier formation leading to the marsh will <br />be at least ten feet in width. <br />3. <br />4. <br />5. <br />SAMUEL MARFIELD LETTER, <br />cont.
The URL can be used to link to this page
Your browser does not support the video tag.