My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Work Session
Orono
>
City Council
>
1999
>
11-22-1999 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:50:32 PM
Creation date
4/19/2023 1:49:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />I <br />I <br />r <br />t <br />I <br />I <br />I <br />I <br />I <br />I <br />L <br />SCOPE <br />The content of the CSPP is intended to be sufTiciently complete so as to address the separate <br />needs of the City, the Metropolitan Council, and the Metropolitan Waste Control Commission <br />Council Environmental Services division. <br />An attempt has been made to include all of the background data and issues which relate to sewer <br />system operations and planning, including brief summaries of land use plans and planning <br />philosophies of the City. For more detailed discussions ofthese related issues, the reader is referred <br />to the other appropriate chapters of the Community Management Plan. <br />Orono's CSPP will perform the following functions: <br />Review, evaluate and consolidate other planning policies and engineering reports into an <br />updated Comprehensive Sewer Policy Plan consistent with other elements of Orono's <br />Community Management Plan. <br />2. Evaluate surface water drainage districts and their impact on sewage treatment. <br />3. Inventory all e.xisting public and private sewage treatment facilities. <br />4. Review' and incorporate community development plans with future sewage treatment needs. <br />5. Provide design data for metropolitan interceptor capacity. <br />6. Provide design guidelines for rural sewage treatment. <br />7. Evaluate existing ordinances and controls including recommendations for changes. <br />8. Evaluate existing administration and enforcement practices including recommendations for <br />changes. <br />The time framework of the CSPP is intended to be consistent with the regional planning period <br />of 4988 2000 through 4998 2020, with MWCC^s programs through the year 2888; with the <br />Water Resources Management Plan projections through 2020, and with the City's permanent <br />planning programs for rural Orono. <br />Tlie goals, policies and facilities plans contained in the CSPP are set in the context of the legislative <br />mandate to plan for regional needs through the year 4998 2020 and beyond . These statistics and <br />programs are particularly primarily applicable to the urban areas of Orono and to the municipal <br />sanitary sewer facilities which serve or are planned to serve these areas. <br />On the other hand, Orono’s long range land use plans call for permanent maintenance of the existing <br />low density rural residential areas. There is to be no staged growth plan for conversion of low <br />Jensitv residential uses to higher density residential uses, and no expansion of the existing urban <br />serv ice area w ill occur only w ithin a few specifically planned areas. Therefore, the goals, plans and <br />programs for on-site sewage treatment in rural Orono are intended to be permanently self-sufficient <br />H-iffy tttp future thmimtf tm reghttal va/uteity. Potential future demands on regional capacity will <br />CMP 6-3
The URL can be used to link to this page
Your browser does not support the video tag.