My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Work Session
Orono
>
City Council
>
1999
>
11-22-1999 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:50:32 PM
Creation date
4/19/2023 1:49:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
areas exc ept Stubbs Da>‘. These identified ho using clusters wo uld remain in the rural service <br />area until do cumented need for sewer service tnitiated feasibility studies: <br />1978 ON»SlTE-SEWAGC TREATMENTCODC ■ ORDINANCCNO. 210. A full-time On- <br />Site Manager was added to the City staff in the Spring o f 1978 to implement the new <br />or dinance and the pro vision s o f the CSP calling for o n-site system inspectio n pro grams. Tlie <br />first area-wide inspectio ns'in 1978 and 197 9 were do ne in the identified ho using clusters <br />with ex tensive record s and do cumentation developed o n cach system and each area. This <br />actual field data resulted in the identification o f the 5 areas currently tmder stud>% and the <br />ranking o f prio rities for thos e studies. <br />1979 STUBBS BAY STUDY AREA MORATORIUM ORDINANCE NO. 219. on Ja nuary <br />23, 1979, the entire Stubbs Bay Area was placed under a construction and develo pment <br />mo ratori um-rcstrieting any new development o r ex pansio n of ex isting uses pending <br />com pletio n of studies on several issues, but particularly including the necessity fo r reso lving <br />sewage treatmentdefieicneic»in the area.-Thta mo rato rium has been exten ded through Ju ly; <br />1980r-ln-December, 1979, an exh austive 93 page resolut ion No. 1099 was ado pted which <br />included directio n to "co ntinue all necessary effo rts to assure that sewage treatment o r <br />collect ion in the Stubbs Bay Area is adequate to prote ct vtatcr quality* and the public health*'. <br />I979S'H1BBS BAY PREL1M1NAR¥-REP0RT UPDATE by Bone stro o ; Ros ene, Andcriik <br />& Assoc iates. Utilizing new so ils-info rmatio n, new data from the-on -Site Management <br />Prog ram and the final Intercepto r locatio n, this brief repo rt updated-the design and co st <br />analysis of the 1975 McCombs study. Project costs were estimated at between $6,000 and <br />$13,000 per unit with the intercepto r con nection and co mmunity drainfield co sts being <br />com parable; <br />1980 SANITARY-SEWER FEASlBtfcffY REPORT by Bo ncstroo,-Ro scno; Anderlik & <br />Assoc iates.-In 1979, the On-Sitc Prog ram identified seriou s sewage treatment deficiencies <br />and system failures in the Minneto nka Bluffs-Wcst Fcmdale (Bro wns Bay) Area. <br />Neighbo rhood meetings wereealled-and a co nsensus given to investigate po ssible municipal <br />sewerage. The City Engineer's Feasibility- Study has been co mpleted-indicating the <br />pos sibility of a sewer project serving 56 units at an average cos t-of between $9,745 and <br />frl6r700 per-unit."Public hearings are pending: <br />1980SAN1TARY SEWER FEASIBILITY REPORT fo r the No rth Sho re Drive/Seoteh Pine <br />Area-has been o rdered by the City Cou ncil as of February, 1980; <br />1979-PRELIMINARY ENGINEERING REPORT FOR THE CITY OF-MEDINA by <br />Me€o mbs Knutson .Assoc iates. The City of Orono has signed an agreement with the cities <br />q1~ Medina and Long Lake to participate in the solut io n of a sewage treatment problem in <br />the Mo mingside ncighbo rhot>d of Medina. This report and pro pos al will- result in the <br />co nstructio n of sewers in the Medina neighbo rhood; a eenneetion bct>vecn Medina and <br />Orono 's e.ststing Orono Seho el's system; and a new bypass line in Long Lake. The net result <br />o f this"for €>ro no is a permanent eonn eetio n of Oron o's Haekbcrty Hills Area to the Lo ng <br />Lake system and the ability fo r Oro no to utilize the capacity within the existi ng Orono <br />Schoo l's lines which ts no w limited by-bottic neeks in the Lo ng-Lake System. <br />implementatio n is a^-aiting federal grants fo r Medina and is planned for eo nstruetio n in <br />4980"o r 1981. <br />1 <br />1 <br />► • <br />CMP 6-48
The URL can be used to link to this page
Your browser does not support the video tag.