Laserfiche WebLink
ex pected urban development and inereased sewage flows shown as reserve capacity in <br />the tables on Page and in the CSPP Appendix. The 1999 review of Orono Sewer <br />Connections (See Appendix ) included an analysis of expected development within <br />each of the 31 existing MUSA areas as well as the areas proposed to be added to the <br />MUSA. For purposes of sewer facilities planning, this expected growth is divided into <br />f9t»r five categories: <br />1) INCREASED FLOW FROM EXISTING USERS. In the case of building <br />expansion or increased occupancy, higher flows could be expected through <br />existing service co inections. No new municipal sewer facilities are required. <br />2) INFILL URBAN DEVELOPMENT. In the case of development of existing <br />vacant urban properties, new connections can be expected through existing <br />service stubs. No new municipal sewer facilities are required. <br />3) NEW URBAN DEVELOPMENT. Certain areas within the existing and <br />proposed Urban Service Area are und'^veloped or developed at less than the <br />zoned densities. New sewer later <s can be expected to be e.xtended into these <br />areas as identified on Map No. 11. Facilities plans for this growth are discussed <br />below. <br />4) EXISTING UNSEWERED DEVELOPMENT. As of this datc,-thcfe are thfcc <br />small pockets of ex isting residential dcvelopmenHvtthin the urban area which <br />are not provided with scwcf lateral scfviee. Facilities plans for eonneetton-ef <br />these units arc discussed beimv. Within Orono’s urban service area, virtually all <br />existing developed areas ha\ e been provided with sewer lateral service. <br />However, within the rural ser\ ice area a number of developed properties which <br />are now (or arc proposed to be) within the MUSA have vet to be provided with <br />municipal sewer laterals. <br />5} NEW SHORELAND DEVELOPMENT. A number of properties within Orono’s <br />rural service area are also within defined Shoreland areas and have been <br />incorporated into the MUS.A to allow their development at rural densities with <br />municipal sewer. <br />Sewer facilities planning for rural Orono is the function of the on-site management <br />program. <br />The Metropolitan Council’s Water Qutdity .Management Policy 13 (Pg W12/79) states <br />that "THE PREFERRED METHOD OF WASTEWATER DlSPOSAfc FOR-NBW <br />RURAL DEVELOPMENT IS THE INDlVlDUAh-QN SITE SYSTEM”. Consistent <br />with this philosophy, and with Orono's commitment to maintenance of permanent rural <br />area.s in the community, Orono has in 1978 pioneered in the establishment of a full- <br />service On-Site Systems Management program designed to assure the continued <br />performance of on-site systems. <br />In terms of sewer facilities planning, the On-Site Systems Management Program can be <br />divided into four categories of activity: <br />CMP 6-44