My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Work Session
Orono
>
City Council
>
1999
>
11-22-1999 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:50:32 PM
Creation date
4/19/2023 1:49:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rural development forecasts have been derived from careful analysis of available land <br />on a parcel bv parcel basis, takine into account recent development trends and the <br />City ’s intended development types and densities for each parcel. <br />In the period 1980-1999 Orono added approximately 500 new residential connections <br />to the municipal sewer system, the majority of which were the result of installation <br />of sewer lines to serve existing residential development. Many of the neighborhood <br />housing clusters served were adjacent to a metropolitan interceptor and made use of <br />interceptor injector stations. <br />In the period 2000-2020. a poiuon of the anticipated residential connections will be <br />from the few remaining urban-densitv housing clusters in the rural area: but the <br />majority of new connections will be from newurban-densitv residential development <br />occurring along the Highway 12 corridor in north central Orono. The primary <br />impacts will be to the LS-60 interceptor service area. While Orono’s other <br />interceptor sei^vice areas will experience only modest flow rate increases. Orono <br />flows to LS-60 are expected to more than double bv 2010. primarily due to new <br />residential development, but partially due to additional commercial and institutional <br />developemnt. Because most of the planned urban-densitv housing in this area is <br />expected to develop in the next 10 years. Orono’s total flows are expected to be at <br />the high end of Met Council’s flow estimates for 2010. but nearer the low forecast <br />for 2020 (see Table ). <br />The combina tion of thg-^v; factors , plus the interceptor injector statio n ca paci ty, will <br />permit connection of certain exis ting housing clusters al ong the interceptorroute plus <br />providing-cap a city fernonTesidential urban development, all within the confines of <br />€>rono^s land use plan and the interceptor design ca pa city. <br />Orono’s projected sewer facility use and reserve capacity needs-is are indicated in the <br />following table. Two populati on Population and household projections are shown: <br />the first is based upon the Nletiv^politan Council's projected population level: the <br />second (lower) figure is the City of Orono's projection included. These are based <br />upon actual Kiiilding pemiit records for the last ten years , as well as on City <br />expectations to: future development based on current and planned zoning. <br />CMP 6-42 I
The URL can be used to link to this page
Your browser does not support the video tag.