My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Work Session
Orono
>
City Council
>
1999
>
11-22-1999 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:50:32 PM
Creation date
4/19/2023 1:49:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />I <br />I <br />r <br />r <br />I <br />I <br />\ <br />I <br />OLD TABLE, NEEDS UPDATING <br />TOTAL ORONO MUNICIPAL SEWER SYSTEM CAPACITY <br />SYSTEM <br />EXISTING <br />UNITS-1980 <br />RESERVE <br />UNITS <br />DESIGN CAPACITY <br />2000 <br />SW Orono <br />Orono Schools <br />Hackberry <br />Orono Injector(s)* <br />1,511 <br />100 <br />25 <br />0 <br />1,099 <br />120 <br />0 <br />163 (future) <br />2,610 <br />220 <br />25 <br />163 <br />Total Orono Flow <br />to Orono-Long Lake <br />Interceptor 1,636 1,382 3,018 <br />Compare to Interceptor <br />design capacity assigned <br />to Orono <br />Wayzata System <br />TOTAL ORONO <br />54 <br />1,690 <br />(3,025) <br />65 <br />3,083 <br />NOTES:* Injectors are city-owned lift stations which will pump into the <br />interceptor. They will be located as required to serve existing isolated <br />pockets of development along the lakeshore if a future need arises to <br />provide alternative sewer serv ice to these areas. <br />1,230 units available now plus 163 future units at injector stations. <br />-INSERT NEW TABLE HERE------------------------------- <br />CMP 6-40 <br />*' <br />-ja.
The URL can be used to link to this page
Your browser does not support the video tag.