My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Packet
Orono
>
City Council
>
1999
>
11-22-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 12:54:37 PM
Creation date
4/19/2023 12:51:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2000 <br />Private Developer's <br />Rate Schedule <br />Classification 2000 <br />Senior Principal <br />Principal/Project Manager | Senior Scientist | Planner <br />Register Engineer/Architect | Natural Resource Specialist | Software Programmer <br />Project Engineer/Architect/Scientist | Senior Field Supervisor <br />GIS Specialist | Senior Designer <br />Graduate Engineer/Architect/Scientist 1 Field Supervisor <br />Senior Draftsperson | Senior Inspector <br />Inspector | Draftsperson | Senior Technician <br />Technician <br />Word Processor <br />Total Station I luipment <br />GIS Workstation Equipment <br />GPS Equipment (per half day) <br />$127.00 <br />$114.00 <br />$99.00 <br />$87.00 <br />$85.00 <br />$77.50 <br />$70.00 <br />$65.00 <br />$46.00 <br />$45.50 <br />$20.00 <br />$20.00 <br />$50.00 <br />These rates are adjusted annually at the first of the year in accordance with the normal review procedures of <br />Bonestroo, Rosene, Anderlik and Associates. Inc. <br />Reimbursable Expenses - At Cost <br />Reproduction, Printing, Duplicating, Mileage <br />Out of pocket expenses such as stakes, field supplies, telephone calls, etc. <br />City of Orono
The URL can be used to link to this page
Your browser does not support the video tag.