Laserfiche WebLink
W 11/16/99 14:45 S :04/08 NO <br />No. <br />Contraet UnR Quantity Amount <br />Ittm Unit Quantity Prioa to Data to Data <br />7 3~ 4» pyQ Qf hope compatible aervtce wye <br />branch EA 3 75 $0.00 <br />8 4** PVC aervtce pipe in place, SOR 26 LF 60 8 $0 00 <br />6 Improved pipe foundaben in 6 ” increment depth LF 200 2 $0 00 <br />10 Mechanicel trench compaction LF 500 0.25 481 $12025 <br />11 Closed circuit TV inspection LF 500 0.5 456 $228.00 <br />12 Connect to existing manhole EA 1 1500 1 $1,500.00 <br />13 ' Remova biluminoue pavement SY 650 0.75 700 $525 00 <br />14 Common excavation (EV)CY 400 7.5 300 $2,250.00 <br />15 Aggregate base, Class 5.100*^ crushed TN 650 10 300 $3,000.00 <br />16 Type 31 bituminoue bee# course TN 120 30 142.7 $4,261.00 <br />17 Type 41A bituminous wearing course TN 60 31 168.2 $6,144.20 <br />16 Geotexliie Filter SY 1050 1 700 $700 00 <br />16 Bituminous matanal for tack coat GAL 100 0.01 0 25 $0 25 <br />20 Bituminous driveway restoration SY 60 10.5 $0 00 <br />21 Sodding, inci 4 ” topsoil SY 1300 3 $0.00 <br />22 Erosion control fence LF 300 2 $0.00 <br />Total Changt Ordar No. 1 $42,484 70 <br />Total Part 1 • Sanitary Sewer <br />Total Part 2 • Reitoratlon <br />Total Change Ordar No. 1 <br />$269.28525 <br />$36,518.35 <br />$42,484.70 <br />Total Work Completed To Date $368,288.30 <br />i. <br />i.i <br />1*1 <br />.1 <br />I <br />I <br />; <br />Rtqvifft f4o 3 lit