My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Packet
Orono
>
City Council
>
1999
>
11-22-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 12:54:37 PM
Creation date
4/19/2023 12:51:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract Unit Quantity Amount <br />No. item Unit Quantity Price <br />to Date to Date <br />1 Mobilization: pump removal and reinstallation LS 1 $3,500.000.704 $2,464.00 <br />2 Televise well EA 2 $1,000.00 1 $1,000.00 <br />3 Wire brush casing with well drilling rig LS 1 $1,780.00 $0.00 <br />4 P & I jetting and air lifting equipment LS 1 $3,280.00 0.73 $2,392.00 <br />5 Water jetting / air lifting HR 40 $135.00 $0.00 <br />6 Superchlorinate well LS 1 $675.00 $0.00 <br />7 Rebuild packing box LS 1 $100.00 $0.00 <br />8 F & I ss. Headshaft LS 1 $200.00 $0.00 <br />9 F & I complete set of bowl bearings LS 1 $165.00 $0.00 <br />10 F & I new ss bowl shaft LS 1 $320.00 $0.00 <br />Machine bowl & impeller & Install bronze wear <br />11 ring, per stage EA 4 $150.00 $0.00 <br />12 Trim impeller to reduce capacity EA 4 $25.00 $0.00 <br />13 8 ” X10* sch. 40 tail pipe LS 1 $160.00 $0.00 <br />14 270' X 1/2“ id PVC dip line tube EA 2 $100.00 $0.00 <br />15 8" X 10' sch. 40 column pipe EA 15 $230.00 $0.00 <br />16 8" X 5' sch. 40 column pipe EA 1 $170.00 $0.00 <br />17 Column coupling EA 16 <br />$30.00 $0.00 <br />18 1 1/2" X 10'ss line shaft EA 15 $175.00 $0.00 <br />19 1 1/2" X 5'ss line shaft EA 1 $135.00 $0.00 <br />20 Ss shaft coupling EA 2 $55.00 $0.00 <br />21 rubber bearing EA 27 $15.00 $0.00 <br />22 Bronze bearing retainer EA 27 $30.00 $0.00 <br />23 Motor inspection, testing, and cleaning LS 1 $1,000.00 $0.00 <br />Complete motor bearing replacement, if <br />24 necessa^LS 1 $500.00 $0.00 <br />Shop time for sandblasting and inspecting pump <br />25 components HR 20 $40.00 20 $800.00 <br />Field time for venting the outer casing, if <br />26 necessary HR 20 $40.00 20 $800.00 <br />rtqutst 1
The URL can be used to link to this page
Your browser does not support the video tag.